Analyzing delay causes in Egyptian construction projects

Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction de...

Descripción completa

Detalles Bibliográficos
Autores principales: Marzouk, Mohamed M., El-Rasas, Tarek I.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2014
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4294731/
https://www.ncbi.nlm.nih.gov/pubmed/25685471
http://dx.doi.org/10.1016/j.jare.2012.11.005
_version_ 1782352758165209088
author Marzouk, Mohamed M.
El-Rasas, Tarek I.
author_facet Marzouk, Mohamed M.
El-Rasas, Tarek I.
author_sort Marzouk, Mohamed M.
collection PubMed
description Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.
format Online
Article
Text
id pubmed-4294731
institution National Center for Biotechnology Information
language English
publishDate 2014
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-42947312015-02-14 Analyzing delay causes in Egyptian construction projects Marzouk, Mohamed M. El-Rasas, Tarek I. J Adv Res Original Article Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented. Elsevier 2014-01 2013-01-28 /pmc/articles/PMC4294731/ /pubmed/25685471 http://dx.doi.org/10.1016/j.jare.2012.11.005 Text en © 2014 Cairo University. Production and hosting by Elsevier B.V. All rights reserved. http://creativecommons.org/licenses/by-nc-nd/3.0/ This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/).
spellingShingle Original Article
Marzouk, Mohamed M.
El-Rasas, Tarek I.
Analyzing delay causes in Egyptian construction projects
title Analyzing delay causes in Egyptian construction projects
title_full Analyzing delay causes in Egyptian construction projects
title_fullStr Analyzing delay causes in Egyptian construction projects
title_full_unstemmed Analyzing delay causes in Egyptian construction projects
title_short Analyzing delay causes in Egyptian construction projects
title_sort analyzing delay causes in egyptian construction projects
topic Original Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4294731/
https://www.ncbi.nlm.nih.gov/pubmed/25685471
http://dx.doi.org/10.1016/j.jare.2012.11.005
work_keys_str_mv AT marzoukmohamedm analyzingdelaycausesinegyptianconstructionprojects
AT elrasastareki analyzingdelaycausesinegyptianconstructionprojects