Analyzing delay causes in Egyptian construction projects
Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction de...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2014
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4294731/ https://www.ncbi.nlm.nih.gov/pubmed/25685471 http://dx.doi.org/10.1016/j.jare.2012.11.005 |
_version_ | 1782352758165209088 |
---|---|
author | Marzouk, Mohamed M. El-Rasas, Tarek I. |
author_facet | Marzouk, Mohamed M. El-Rasas, Tarek I. |
author_sort | Marzouk, Mohamed M. |
collection | PubMed |
description | Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented. |
format | Online Article Text |
id | pubmed-4294731 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2014 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-42947312015-02-14 Analyzing delay causes in Egyptian construction projects Marzouk, Mohamed M. El-Rasas, Tarek I. J Adv Res Original Article Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented. Elsevier 2014-01 2013-01-28 /pmc/articles/PMC4294731/ /pubmed/25685471 http://dx.doi.org/10.1016/j.jare.2012.11.005 Text en © 2014 Cairo University. Production and hosting by Elsevier B.V. All rights reserved. http://creativecommons.org/licenses/by-nc-nd/3.0/ This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/3.0/). |
spellingShingle | Original Article Marzouk, Mohamed M. El-Rasas, Tarek I. Analyzing delay causes in Egyptian construction projects |
title | Analyzing delay causes in Egyptian construction projects |
title_full | Analyzing delay causes in Egyptian construction projects |
title_fullStr | Analyzing delay causes in Egyptian construction projects |
title_full_unstemmed | Analyzing delay causes in Egyptian construction projects |
title_short | Analyzing delay causes in Egyptian construction projects |
title_sort | analyzing delay causes in egyptian construction projects |
topic | Original Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4294731/ https://www.ncbi.nlm.nih.gov/pubmed/25685471 http://dx.doi.org/10.1016/j.jare.2012.11.005 |
work_keys_str_mv | AT marzoukmohamedm analyzingdelaycausesinegyptianconstructionprojects AT elrasastareki analyzingdelaycausesinegyptianconstructionprojects |