Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of ord...
Autores principales: | Li, Shanlin, Li, Maoqin |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi Publishing Corporation
2015
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4345271/ https://www.ncbi.nlm.nih.gov/pubmed/25785285 http://dx.doi.org/10.1155/2015/804968 |
Ejemplares similares
-
Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due date
por: Xu, Zhenzhen, et al.
Publicado: (2015) -
An Arrival and Departure Time Predictor for Scheduling Communication in Opportunistic IoT
por: Pozza, Riccardo, et al.
Publicado: (2016) -
A bi-objective integer programming model for partly-restricted flight departure scheduling
por: Zhong, Han, et al.
Publicado: (2018) -
Philippines - Departure
por: Ecarnot, Jean-Francois
Publicado: (2014) -
Senegal - Departure
por: Costa, Flavio
Publicado: (2014)