Cargando…

An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown

In real supply chain environments, the discontinuous multidelivery policy is often used when finished products need to be transported to retailers or customers outside the production units. To address this real-life production-shipment situation, this study extends recent work using an economic prod...

Descripción completa

Detalles Bibliográficos
Autores principales: Chiu, Singa Wang, Lin, Hong-Dar, Song, Ming-Syuan, Chen, Hsin-Mei, Chiu, Yuan-Shyi P.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi Publishing Corporation 2015
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4364070/
https://www.ncbi.nlm.nih.gov/pubmed/25821853
http://dx.doi.org/10.1155/2015/621978
_version_ 1782362017455144960
author Chiu, Singa Wang
Lin, Hong-Dar
Song, Ming-Syuan
Chen, Hsin-Mei
Chiu, Yuan-Shyi P.
author_facet Chiu, Singa Wang
Lin, Hong-Dar
Song, Ming-Syuan
Chen, Hsin-Mei
Chiu, Yuan-Shyi P.
author_sort Chiu, Singa Wang
collection PubMed
description In real supply chain environments, the discontinuous multidelivery policy is often used when finished products need to be transported to retailers or customers outside the production units. To address this real-life production-shipment situation, this study extends recent work using an economic production quantity- (EPQ-) based inventory model with a continuous inventory issuing policy, defective items, and machine breakdown by incorporating a multiple delivery policy into the model to replace the continuous policy and investigates the effect on the optimal run time decision for this specific EPQ model. Next, we further expand the scope of the problem to combine the retailer's stock holding cost into our study. This enhanced EPQ-based model can be used to reflect the situation found in contemporary manufacturing firms in which finished products are delivered to the producer's own retail stores and stocked there for sale. A second model is developed and studied. With the help of mathematical modeling and optimization techniques, the optimal run times that minimize the expected total system costs comprising costs incurred in production units, transportation, and retail stores are derived, for both models. Numerical examples are provided to demonstrate the applicability of our research results.
format Online
Article
Text
id pubmed-4364070
institution National Center for Biotechnology Information
language English
publishDate 2015
publisher Hindawi Publishing Corporation
record_format MEDLINE/PubMed
spelling pubmed-43640702015-03-29 An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown Chiu, Singa Wang Lin, Hong-Dar Song, Ming-Syuan Chen, Hsin-Mei Chiu, Yuan-Shyi P. ScientificWorldJournal Research Article In real supply chain environments, the discontinuous multidelivery policy is often used when finished products need to be transported to retailers or customers outside the production units. To address this real-life production-shipment situation, this study extends recent work using an economic production quantity- (EPQ-) based inventory model with a continuous inventory issuing policy, defective items, and machine breakdown by incorporating a multiple delivery policy into the model to replace the continuous policy and investigates the effect on the optimal run time decision for this specific EPQ model. Next, we further expand the scope of the problem to combine the retailer's stock holding cost into our study. This enhanced EPQ-based model can be used to reflect the situation found in contemporary manufacturing firms in which finished products are delivered to the producer's own retail stores and stocked there for sale. A second model is developed and studied. With the help of mathematical modeling and optimization techniques, the optimal run times that minimize the expected total system costs comprising costs incurred in production units, transportation, and retail stores are derived, for both models. Numerical examples are provided to demonstrate the applicability of our research results. Hindawi Publishing Corporation 2015 2015-03-04 /pmc/articles/PMC4364070/ /pubmed/25821853 http://dx.doi.org/10.1155/2015/621978 Text en Copyright © 2015 Singa Wang Chiu et al. https://creativecommons.org/licenses/by/3.0/ This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
spellingShingle Research Article
Chiu, Singa Wang
Lin, Hong-Dar
Song, Ming-Syuan
Chen, Hsin-Mei
Chiu, Yuan-Shyi P.
An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_full An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_fullStr An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_full_unstemmed An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_short An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
title_sort extended epq-based problem with a discontinuous delivery policy, scrap rate, and random breakdown
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4364070/
https://www.ncbi.nlm.nih.gov/pubmed/25821853
http://dx.doi.org/10.1155/2015/621978
work_keys_str_mv AT chiusingawang anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT linhongdar anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT songmingsyuan anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT chenhsinmei anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT chiuyuanshyip anextendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT chiusingawang extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT linhongdar extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT songmingsyuan extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT chenhsinmei extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown
AT chiuyuanshyip extendedepqbasedproblemwithadiscontinuousdeliverypolicyscraprateandrandombreakdown