Cargando…
Solving multi-customer FPR model with quality assurance and discontinuous deliveries using a two-phase algebraic approach
A multi-customer finite production rate (FPR) model with quality assurance and discontinuous delivery policy was investigated in a recent paper (Chiu et al. in J Appl Res Technol 12(1):5–13, 2014) using differential calculus approach. This study employs mathematical modeling along with a two-phase a...
Autores principales: | Chiu, Yuan-Shyi Peter, Chou, Chung-Li, Chang, Huei-Hsin, Chiu, Singa Wang |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer International Publishing
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4839027/ https://www.ncbi.nlm.nih.gov/pubmed/27186457 http://dx.doi.org/10.1186/s40064-016-2154-0 |
Ejemplares similares
-
An Extended EPQ-Based Problem with a Discontinuous Delivery Policy, Scrap Rate, and Random Breakdown
por: Chiu, Singa Wang, et al.
Publicado: (2015) -
Mathematical modeling of a multi-product EMQ model with an enhanced end items issuing policy and failures in rework
por: Chiu, Yuan-Shyi Peter, et al.
Publicado: (2015) -
Producer–retailer integrated EMQ system with machine breakdown, rework failures, and a discontinuous inventory issuing policy
por: Chiu, Singa Wang, et al.
Publicado: (2016) -
Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework
por: Chiu, Singa Wang, et al.
Publicado: (2016) -
On intra-supply chain system with an improved distribution plan, multiple sales locations and quality assurance
por: Chiu, Singa Wang, et al.
Publicado: (2015)