Forecasting and prevention of water inrush during the excavation process of a diversion tunnel at the Jinping II Hydropower Station, China

INTRODUCTION: Estimating groundwater inflow into a tunnel before and during the excavation process is an important task to ensure the safety and schedule during the underground construction process. CASE DESCRIPTION: Here we report a case of the forecasting and prevention of water inrush at the Jinp...