Cargando…
Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization
Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru forma...
Autores principales: | Yu, Yang, Wang, Sihan, Tang, Jiafu, Kaku, Ikou, Sun, Wei |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer International Publishing
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4916081/ https://www.ncbi.nlm.nih.gov/pubmed/27390649 http://dx.doi.org/10.1186/s40064-016-2445-5 |
Ejemplares similares
-
Multi-Objective and Parallel Particle Swarm Optimization Algorithm for Container-Based Microservice Scheduling
por: Chen, Xinying, et al.
Publicado: (2021) -
Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem
por: Chen, Xiaopan, et al.
Publicado: (2015) -
Optimization of heterogeneous vehicle logistics scheduling with multi-objectives and multi-centers
por: He, Zhaolei, et al.
Publicado: (2023) -
A multi-objective scheduling optimization algorithm of a camera network for directional road network coverage
por: Gao, Fei, et al.
Publicado: (2018) -
Multi-objective AGV scheduling in an FMS using a hybrid of genetic algorithm and particle swarm optimization
por: Mousavi, Maryam, et al.
Publicado: (2017)