Cargando…

Using Top‐down and Bottom‐up Costing Approaches in LMICs: The Case for Using Both to Assess the Incremental Costs of New Technologies at Scale

PURPOSE: Estimating the incremental costs of scaling‐up novel technologies in low‐income and middle‐income countries is a methodologically challenging and substantial empirical undertaking, in the absence of routine cost data collection. We demonstrate a best practice pragmatic approach to estimate...

Descripción completa

Detalles Bibliográficos
Autores principales: Cunnama, Lucy, Sinanovic, Edina, Ramma, Lebogang, Foster, Nicola, Berrie, Leigh, Stevens, Wendy, Molapo, Sebaka, Marokane, Puleng, McCarthy, Kerrigan, Churchyard, Gavin, Vassall, Anna
Formato: Online Artículo Texto
Lenguaje:English
Publicado: John Wiley and Sons Inc. 2016
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5066665/
https://www.ncbi.nlm.nih.gov/pubmed/26763594
http://dx.doi.org/10.1002/hec.3295
Descripción
Sumario:PURPOSE: Estimating the incremental costs of scaling‐up novel technologies in low‐income and middle‐income countries is a methodologically challenging and substantial empirical undertaking, in the absence of routine cost data collection. We demonstrate a best practice pragmatic approach to estimate the incremental costs of new technologies in low‐income and middle‐income countries, using the example of costing the scale‐up of Xpert Mycobacterium tuberculosis (MTB)/resistance to riframpicin (RIF) in South Africa. MATERIALS AND METHODS: We estimate costs, by applying two distinct approaches of bottom‐up and top‐down costing, together with an assessment of processes and capacity. RESULTS: The unit costs measured using the different methods of bottom‐up and top‐down costing, respectively, are $US16.9 and $US33.5 for Xpert MTB/RIF, and $US6.3 and $US8.5 for microscopy. The incremental cost of Xpert MTB/RIF is estimated to be between $US14.7 and $US17.7. While the average cost of Xpert MTB/RIF was higher than previous studies using standard methods, the incremental cost of Xpert MTB/RIF was found to be lower. CONCLUSION: Costs estimates are highly dependent on the method used, so an approach, which clearly identifies resource‐use data collected from a bottom‐up or top‐down perspective, together with capacity measurement, is recommended as a pragmatic approach to capture true incremental cost where routine cost data are scarce.