Use of a 10.22 m diameter EPB shield: a case study in Beijing subway construction

INTRODUCTION: Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city. Due to the surface and underground space limitations of this section, a double-track running tunnel instead of two single-track running tunnel...