Cargando…
Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
This paper presents a novel method on the optimization of bi-objective Flexible Job-shop Scheduling Problem (FJSP) under stochastic processing times. The robust counterpart model and the Non-dominated Sorting Genetic Algorithm II (NSGA-II) are used to solve the bi-objective FJSP with consideration o...
Autores principales: | Yang, Xin, Zeng, Zhenxiang, Wang, Ruidong, Sun, Xueshan |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5131930/ https://www.ncbi.nlm.nih.gov/pubmed/27907163 http://dx.doi.org/10.1371/journal.pone.0167427 |
Ejemplares similares
-
An Approach to Integrated Scheduling of Flexible Job-Shop Considering Conflict-Free Routing Problems
por: Sun, Jiachen, et al.
Publicado: (2023) -
Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization
por: Huang, Song, et al.
Publicado: (2016) -
An Improved African Vulture Optimization Algorithm for Dual-Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problems
por: He, Zhou, et al.
Publicado: (2022) -
An Improved Genetic Algorithm for Solving the Multi-AGV Flexible Job Shop Scheduling Problem
por: Meng, Leilei, et al.
Publicado: (2023) -
Multi-population genetic algorithm with ER network for solving flexible job shop scheduling problems
por: Shi, Xiaoqiu, et al.
Publicado: (2020)