Cargando…
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to o...
Autores principales: | Fu, Fang, Zhang, Tao |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5135070/ https://www.ncbi.nlm.nih.gov/pubmed/27911939 http://dx.doi.org/10.1371/journal.pone.0167142 |
Ejemplares similares
-
Utilizing artificial intelligence to solving time – cost – quality trade-off problem
por: Son, Pham Vu Hong, et al.
Publicado: (2022) -
Multiple objective immune wolf colony algorithm for solving time-cost-quality trade-off problem
por: Liu, Guanyi, et al.
Publicado: (2023) -
Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model
por: Son, Pham Vu Hong, et al.
Publicado: (2023) -
Time-space trade-offs in population protocols for the majority problem
por: Berenbrink, Petra, et al.
Publicado: (2020) -
Construct validity of the interview Time Trade-Off and computer Time Trade-Off in patients with rheumatoid arthritis: A cross-sectional observational pilot study
por: Buitinga, Laurien, et al.
Publicado: (2012)