Cargando…
Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework
Globalization has created tremendous opportunities, but also made business environment highly competitive and turbulent. To gain competitive advantage, management of present-day transnational firms always seeks options to trim down various transaction and coordination costs, especially in the area o...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5137895/ https://www.ncbi.nlm.nih.gov/pubmed/27918588 http://dx.doi.org/10.1371/journal.pone.0167511 |
_version_ | 1782471976906915840 |
---|---|
author | Chiu, Singa Wang Chen, Shin-Wei Chang, Chih-Kai Chiu, Yuan-Shyi Peter |
author_facet | Chiu, Singa Wang Chen, Shin-Wei Chang, Chih-Kai Chiu, Yuan-Shyi Peter |
author_sort | Chiu, Singa Wang |
collection | PubMed |
description | Globalization has created tremendous opportunities, but also made business environment highly competitive and turbulent. To gain competitive advantage, management of present-day transnational firms always seeks options to trim down various transaction and coordination costs, especially in the area of controllable intra-supply chain system. This study investigates a multi–product intra-supply chain system with failure in rework. To achieve maximum machine utilization, multiple products are fabricated in succession on a single machine. During the process, production of some defective items is inevitable. Reworking of nonconforming items is used to reduce the quality cost in production and achieving the goal of lower overall production cost. Because reworks are sometimes unsuccessful, failures in rework are also considered in this study. Finished goods for each product are transported to the sales offices when the entire production lot is quality assured after rework. A multi-delivery policy is used, wherein fixed quantity n installments of the finished lot are transported at fixed intervals during delivery time. The objective is to jointly determine the common production cycle time and the number of deliveries needed to minimize the long–term expected production–inventory–delivery costs for the problem. With the help of a mathematical model along with optimization technique, the optimal production–shipment policy is obtained. We have used a numerical example to demonstrate applicability of the result of our research. |
format | Online Article Text |
id | pubmed-5137895 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2016 |
publisher | Public Library of Science |
record_format | MEDLINE/PubMed |
spelling | pubmed-51378952016-12-21 Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework Chiu, Singa Wang Chen, Shin-Wei Chang, Chih-Kai Chiu, Yuan-Shyi Peter PLoS One Research Article Globalization has created tremendous opportunities, but also made business environment highly competitive and turbulent. To gain competitive advantage, management of present-day transnational firms always seeks options to trim down various transaction and coordination costs, especially in the area of controllable intra-supply chain system. This study investigates a multi–product intra-supply chain system with failure in rework. To achieve maximum machine utilization, multiple products are fabricated in succession on a single machine. During the process, production of some defective items is inevitable. Reworking of nonconforming items is used to reduce the quality cost in production and achieving the goal of lower overall production cost. Because reworks are sometimes unsuccessful, failures in rework are also considered in this study. Finished goods for each product are transported to the sales offices when the entire production lot is quality assured after rework. A multi-delivery policy is used, wherein fixed quantity n installments of the finished lot are transported at fixed intervals during delivery time. The objective is to jointly determine the common production cycle time and the number of deliveries needed to minimize the long–term expected production–inventory–delivery costs for the problem. With the help of a mathematical model along with optimization technique, the optimal production–shipment policy is obtained. We have used a numerical example to demonstrate applicability of the result of our research. Public Library of Science 2016-12-05 /pmc/articles/PMC5137895/ /pubmed/27918588 http://dx.doi.org/10.1371/journal.pone.0167511 Text en © 2016 Chiu et al http://creativecommons.org/licenses/by/4.0/ This is an open access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/) , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited. |
spellingShingle | Research Article Chiu, Singa Wang Chen, Shin-Wei Chang, Chih-Kai Chiu, Yuan-Shyi Peter Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework |
title | Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework |
title_full | Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework |
title_fullStr | Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework |
title_full_unstemmed | Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework |
title_short | Optimization of a Multi–Product Intra-Supply Chain System with Failure in Rework |
title_sort | optimization of a multi–product intra-supply chain system with failure in rework |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5137895/ https://www.ncbi.nlm.nih.gov/pubmed/27918588 http://dx.doi.org/10.1371/journal.pone.0167511 |
work_keys_str_mv | AT chiusingawang optimizationofamultiproductintrasupplychainsystemwithfailureinrework AT chenshinwei optimizationofamultiproductintrasupplychainsystemwithfailureinrework AT changchihkai optimizationofamultiproductintrasupplychainsystemwithfailureinrework AT chiuyuanshyipeter optimizationofamultiproductintrasupplychainsystemwithfailureinrework |