Cargando…
New evidence of Yangtze delta recession after closing of the Three Gorges Dam
Many deltas are likely undergoing net erosion because of rapid decreases in riverine sediment supply and rising global sea levels. However, detecting erosion in subaqueous deltas is usually difficult because of the lack of bathymetric data. In this study, by comparing bathymetric data between 1981 a...
Autores principales: | Luo, X. X., Yang, S. L., Wang, R. S., Zhang, C. Y., Li, P. |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group
2017
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5286395/ https://www.ncbi.nlm.nih.gov/pubmed/28145520 http://dx.doi.org/10.1038/srep41735 |
Ejemplares similares
-
Detection of the Three Gorges Dam influence on the Changjiang (Yangtze River) submerged delta
por: Dai, Zhijun, et al.
Publicado: (2014) -
Regime shift in fish assemblage structure in the Yangtze River following construction of the Three Gorges Dam
por: Gao, Xin, et al.
Publicado: (2019) -
Spatial and Temporal Changes of Sand Mining in the Yangtze River Basin since the Establishment of the Three Gorges Dam
por: Ma, Yugai, et al.
Publicado: (2022) -
Riverbed erosion of the final 565 kilometers of the Yangtze River (Changjiang) following construction of the Three Gorges Dam
por: Zheng, Shuwei, et al.
Publicado: (2018) -
Three Gorges Dam: the changing trend of snail density in the Yangtze River basin between 1990 and 2019
por: Gong, Yanfeng, et al.
Publicado: (2023)