Cargando…
Improving value in primary total joint arthroplasty care pathways: changes in inpatient physical therapy staffing
BACKGROUND: An early physical therapy (PT) care pathway was implemented to provide same-day ambulation after total joint arthroplasty by changing PT staffing hours. METHODS: After receiving an exemption from our institutional review board, we performed a secondary data analysis on a cohort of patien...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5365407/ https://www.ncbi.nlm.nih.gov/pubmed/28378006 http://dx.doi.org/10.1016/j.artd.2016.02.003 |
Sumario: | BACKGROUND: An early physical therapy (PT) care pathway was implemented to provide same-day ambulation after total joint arthroplasty by changing PT staffing hours. METHODS: After receiving an exemption from our institutional review board, we performed a secondary data analysis on a cohort of patients that underwent primary TJA of the hip or knee 6 months before and 12 months after implementation of the change. Data on same-day ambulation rates, length of stay (LOS), and in-hospital costs were reviewed. RESULTS: Early evaluation and mobilization of patients by PT improved on postoperative day (POD) 0 from 64% to 85% after the change (P ≤ .001). The median LOS before the change was 3.27 days compared to 3.23 days after the change (P = .014). Patients with higher American Society of Anesthesiologists scores were less likely to ambulate on POD 0 (P = .038) and had longer hospital stays (P < .001). Early mobilization in the entire cohort was associated with a greater cost savings (P < .001). CONCLUSIONS: A relatively simple change to staffing hours, using resources currently available to us, and little additional financial or institutional investment resulted in a significant improvement in the number of patients ambulating on POD 0, with a modest reduction in both LOS and inpatient costs. |
---|