Cargando…

Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains

This paper presents a 0–1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies o...

Descripción completa

Detalles Bibliográficos
Autores principales: Lin, Boliang, Wang, Jiaxi, Wang, Huasheng, Wang, Zhongkai, Li, Jian, Lin, Ruixi, Xiao, Jie, Wu, Jianping
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2017
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5417615/
https://www.ncbi.nlm.nih.gov/pubmed/28472097
http://dx.doi.org/10.1371/journal.pone.0176961
Descripción
Sumario:This paper presents a 0–1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies of China’s high-speed railway system is proposed. In addition, we analyse the shortage time using PERT, and then calculate the unit time shortage cost from the viewpoint of train operation revenue. Finally, a real-world case study from Shanghai Depot is conducted to demonstrate our method. Computational results offer an effective and efficient decision support for inventory managers.