Quality and quantity of construction and demolition waste in Tehran

BACKGROUND: In recent years the generation rate of construction and demolition waste (C&D) has significantly augmented. The aim of this study was to assessed the quality and quantity of construction and demolition waste in Tehran (capital of Iran). METHODS: Questionnaire methods were used for es...

Descripción completa

Detalles Bibliográficos
Autores principales: Asgari, Alireza, Ghorbanian, Tahereh, Yousefi, Nader, Dadashzadeh, Dariush, Khalili, Fatemeh, Bagheri, Amin, Raei, Mehdi, Mahvi, Amir Hossein
Formato: Online Artículo Texto
Lenguaje:English
Publicado: BioMed Central 2017
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5479027/
https://www.ncbi.nlm.nih.gov/pubmed/28649387
http://dx.doi.org/10.1186/s40201-017-0276-0
_version_ 1783245060214620160
author Asgari, Alireza
Ghorbanian, Tahereh
Yousefi, Nader
Dadashzadeh, Dariush
Khalili, Fatemeh
Bagheri, Amin
Raei, Mehdi
Mahvi, Amir Hossein
author_facet Asgari, Alireza
Ghorbanian, Tahereh
Yousefi, Nader
Dadashzadeh, Dariush
Khalili, Fatemeh
Bagheri, Amin
Raei, Mehdi
Mahvi, Amir Hossein
author_sort Asgari, Alireza
collection PubMed
description BACKGROUND: In recent years the generation rate of construction and demolition waste (C&D) has significantly augmented. The aim of this study was to assessed the quality and quantity of construction and demolition waste in Tehran (capital of Iran). METHODS: Questionnaire methods were used for estimating the amount of generated C&D wastes national statistical data and typical waste generation data. In order to defining the composition of C&D waste, trucks were randomly selected and their wastes were separated and weighted. RESULTS: According to obtained results, about 82,646,051 m(3) of C&D waste (average 16,529,210 m(3) per year) were generated during 2011 to 2016 which only about 26% of them has been recycled. Mixing sand and cement, concrete, broken bricks and soil have the highest amount of the composition of C&D waste in Tehran that was 30, 19, 18 and 11%, respectively. Based on the results, about 2,784,158 t of the waste will generate in 2025 and this is approximately 122% higher than wastes generate in 2016. Based on MAPSA’s data, 360 teams of personnel cruise and control the illegal disposals, but due to the expansion of Tehran this number of teams is inadequate and can’t be effective in controlling the situation. CONCLUSION: In general, the overall condition of C&D waste management in Tehran seems undesirable and needs to be updated based on the experience of successful countries in this field.
format Online
Article
Text
id pubmed-5479027
institution National Center for Biotechnology Information
language English
publishDate 2017
publisher BioMed Central
record_format MEDLINE/PubMed
spelling pubmed-54790272017-06-23 Quality and quantity of construction and demolition waste in Tehran Asgari, Alireza Ghorbanian, Tahereh Yousefi, Nader Dadashzadeh, Dariush Khalili, Fatemeh Bagheri, Amin Raei, Mehdi Mahvi, Amir Hossein J Environ Health Sci Eng Research Article BACKGROUND: In recent years the generation rate of construction and demolition waste (C&D) has significantly augmented. The aim of this study was to assessed the quality and quantity of construction and demolition waste in Tehran (capital of Iran). METHODS: Questionnaire methods were used for estimating the amount of generated C&D wastes national statistical data and typical waste generation data. In order to defining the composition of C&D waste, trucks were randomly selected and their wastes were separated and weighted. RESULTS: According to obtained results, about 82,646,051 m(3) of C&D waste (average 16,529,210 m(3) per year) were generated during 2011 to 2016 which only about 26% of them has been recycled. Mixing sand and cement, concrete, broken bricks and soil have the highest amount of the composition of C&D waste in Tehran that was 30, 19, 18 and 11%, respectively. Based on the results, about 2,784,158 t of the waste will generate in 2025 and this is approximately 122% higher than wastes generate in 2016. Based on MAPSA’s data, 360 teams of personnel cruise and control the illegal disposals, but due to the expansion of Tehran this number of teams is inadequate and can’t be effective in controlling the situation. CONCLUSION: In general, the overall condition of C&D waste management in Tehran seems undesirable and needs to be updated based on the experience of successful countries in this field. BioMed Central 2017-06-20 /pmc/articles/PMC5479027/ /pubmed/28649387 http://dx.doi.org/10.1186/s40201-017-0276-0 Text en © The Author(s). 2017 Open AccessThis article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The Creative Commons Public Domain Dedication waiver (http://creativecommons.org/publicdomain/zero/1.0/) applies to the data made available in this article, unless otherwise stated.
spellingShingle Research Article
Asgari, Alireza
Ghorbanian, Tahereh
Yousefi, Nader
Dadashzadeh, Dariush
Khalili, Fatemeh
Bagheri, Amin
Raei, Mehdi
Mahvi, Amir Hossein
Quality and quantity of construction and demolition waste in Tehran
title Quality and quantity of construction and demolition waste in Tehran
title_full Quality and quantity of construction and demolition waste in Tehran
title_fullStr Quality and quantity of construction and demolition waste in Tehran
title_full_unstemmed Quality and quantity of construction and demolition waste in Tehran
title_short Quality and quantity of construction and demolition waste in Tehran
title_sort quality and quantity of construction and demolition waste in tehran
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5479027/
https://www.ncbi.nlm.nih.gov/pubmed/28649387
http://dx.doi.org/10.1186/s40201-017-0276-0
work_keys_str_mv AT asgarialireza qualityandquantityofconstructionanddemolitionwasteintehran
AT ghorbaniantahereh qualityandquantityofconstructionanddemolitionwasteintehran
AT yousefinader qualityandquantityofconstructionanddemolitionwasteintehran
AT dadashzadehdariush qualityandquantityofconstructionanddemolitionwasteintehran
AT khalilifatemeh qualityandquantityofconstructionanddemolitionwasteintehran
AT bagheriamin qualityandquantityofconstructionanddemolitionwasteintehran
AT raeimehdi qualityandquantityofconstructionanddemolitionwasteintehran
AT mahviamirhossein qualityandquantityofconstructionanddemolitionwasteintehran