Cargando…
Comparison of patient hospital length of stay pre and post implementation of the CLINITEK AUWi System from Siemens to screen out negative urine samples intended for culture: A retrospective cohort study
OBJECTIVE: To determine the impact of using the CLINITEK AUWi System to screen out negative urine samples intended for culture on patient length of stay and culture results at a community teaching hospital. DESIGN AND METHODS: We used a retrospective cohort design to compare length of stay for patie...
Autores principales: | Gonzalez, Mario, Dito, Mary Ellen, Razzano, Dana, Schubert, Finn D. |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2016
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5574511/ https://www.ncbi.nlm.nih.gov/pubmed/28856202 http://dx.doi.org/10.1016/j.plabm.2016.04.001 |
Ejemplares similares
-
Werner Von Siemens
por: Jiménez Alarcón, Moisés
Publicado: (1989) -
The emergency department length of stay: Is the time running out?
por: Becker, Alexander, et al.
Publicado: (2019) -
Aplicaciones del PLC Siemens /
por: Palacios Vázquez, José Luis
Publicado: (2000) -
CERN openlab projects with Siemens
por: Kulaga, Rafal, et al.
Publicado: (2021) -
Sir William Siemens: 1823-1883
por: König, Wolfgang, et al.
Publicado: (2020)