Scheduling multi-task jobs with extra utility in data centers
This paper investigates the problem of maximizing utility for job scheduling where each job consists of multiple tasks, each task has utility and each job also has extra utility if all tasks of that job are completed. We provide a 2-approximation algorithm for the single-machine case and a 2-approxi...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer International Publishing
2017
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5701962/ https://www.ncbi.nlm.nih.gov/pubmed/29213279 http://dx.doi.org/10.1186/s13638-017-0986-0 |
Sumario: | This paper investigates the problem of maximizing utility for job scheduling where each job consists of multiple tasks, each task has utility and each job also has extra utility if all tasks of that job are completed. We provide a 2-approximation algorithm for the single-machine case and a 2-approximation algorithm for the multi-machine problem. Both algorithms include two steps. The first step employs the Earliest Deadline First method to compute utility with only extra job utility, and it is proved that it obtains the optimal result for this sub-problem. The second step employs a Dynamic Programming method to compute utility without extra job utility, and it also derives the optimal result. An approximation result can then be obtained by combining the results of the two steps. |
---|