Cargando…

Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams

Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States. The risk of ground falls during pillar recovery increases in multiple-seam mining conditions. The hazards associated with pill...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhang, Peter, Tulu, Berk, Sears, Morgan, Trackemas, Jack
Formato: Online Artículo Texto
Lenguaje:English
Publicado: 2017
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5798255/
https://www.ncbi.nlm.nih.gov/pubmed/29423329
http://dx.doi.org/10.1016/j.ijmst.2017.12.012
_version_ 1783297833335521280
author Zhang, Peter
Tulu, Berk
Sears, Morgan
Trackemas, Jack
author_facet Zhang, Peter
Tulu, Berk
Sears, Morgan
Trackemas, Jack
author_sort Zhang, Peter
collection PubMed
description Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States. The risk of ground falls during pillar recovery increases in multiple-seam mining conditions. The hazards associated with pillar recovery in multiple-seam mining include roof cutters, roof falls, rib rolls, coal outbursts, and floor heave. When pillar recovery is planned in multiple seams, it is critical to properly design the mining sequence and panel layout to minimize potential seam interaction. This paper addresses geotechnical considerations for concurrent pillar recovery in two coal seams with 21 m of interburden under about 305 m of depth of cover. The study finds that, for interburden thickness of 21 m, the multiple-seam mining influence zone in the lower seam is directly under the barrier pillar within about 30 m from the gob edge of the upper seam. The peak stress in the interburden transfers down at an angle of approximately 20°away from the gob, and the entries and crosscuts in the influence zone are subjected to elevated stress during development and retreat. The study also suggests that, for full pillar recovery in close-distance multiple-seam scenarios, it is optimal to superimpose the gobs in both seams, but it is not necessary to superimpose the pillars. If the entries and/or crosscuts in the lower seam are developed outside the gob line of the upper seam, additional roof and rib support needs to be considered to account for the elevated stress in the multiple-seam influence zone.
format Online
Article
Text
id pubmed-5798255
institution National Center for Biotechnology Information
language English
publishDate 2017
record_format MEDLINE/PubMed
spelling pubmed-57982552018-04-01 Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams Zhang, Peter Tulu, Berk Sears, Morgan Trackemas, Jack Int J Min Sci Technol Article Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground fall fatalities in underground coal mines in the United States. The risk of ground falls during pillar recovery increases in multiple-seam mining conditions. The hazards associated with pillar recovery in multiple-seam mining include roof cutters, roof falls, rib rolls, coal outbursts, and floor heave. When pillar recovery is planned in multiple seams, it is critical to properly design the mining sequence and panel layout to minimize potential seam interaction. This paper addresses geotechnical considerations for concurrent pillar recovery in two coal seams with 21 m of interburden under about 305 m of depth of cover. The study finds that, for interburden thickness of 21 m, the multiple-seam mining influence zone in the lower seam is directly under the barrier pillar within about 30 m from the gob edge of the upper seam. The peak stress in the interburden transfers down at an angle of approximately 20°away from the gob, and the entries and crosscuts in the influence zone are subjected to elevated stress during development and retreat. The study also suggests that, for full pillar recovery in close-distance multiple-seam scenarios, it is optimal to superimpose the gobs in both seams, but it is not necessary to superimpose the pillars. If the entries and/or crosscuts in the lower seam are developed outside the gob line of the upper seam, additional roof and rib support needs to be considered to account for the elevated stress in the multiple-seam influence zone. 2017-12-21 2018-01 /pmc/articles/PMC5798255/ /pubmed/29423329 http://dx.doi.org/10.1016/j.ijmst.2017.12.012 Text en http://creativecommons.org/licenses/by-nc-nd/4.0/ This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
spellingShingle Article
Zhang, Peter
Tulu, Berk
Sears, Morgan
Trackemas, Jack
Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
title Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
title_full Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
title_fullStr Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
title_full_unstemmed Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
title_short Geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
title_sort geotechnical considerations for concurrent pillar recovery in close-distance multiple seams
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5798255/
https://www.ncbi.nlm.nih.gov/pubmed/29423329
http://dx.doi.org/10.1016/j.ijmst.2017.12.012
work_keys_str_mv AT zhangpeter geotechnicalconsiderationsforconcurrentpillarrecoveryinclosedistancemultipleseams
AT tuluberk geotechnicalconsiderationsforconcurrentpillarrecoveryinclosedistancemultipleseams
AT searsmorgan geotechnicalconsiderationsforconcurrentpillarrecoveryinclosedistancemultipleseams
AT trackemasjack geotechnicalconsiderationsforconcurrentpillarrecoveryinclosedistancemultipleseams