Cargando…
Compressed Air Working in Chennai During Metro Tunnel Construction: Occupational Health Problems
Chennai metropolis has been growing rapidly. Need was felt of a metro rail system. Two corridors were planned. Corridor 1, of 23 km starting from Washermanpet to Airport. 14.3 km of this would be underground. Corridor 2, of 22 km starting from Chennai Central Railway station to St. Thomas Mount. 9.7...
Autor principal: | Kulkarni, Ajit C. |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Medknow Publications & Media Pvt Ltd
2017
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5868083/ https://www.ncbi.nlm.nih.gov/pubmed/29618908 http://dx.doi.org/10.4103/ijoem.IJOEM_38_17 |
Ejemplares similares
-
Evaluation of Heat Stress in Construction Site of Metro Rail in Chennai
por: Kulkarni, Ajit C., et al.
Publicado: (2018) -
Structural Monitoring of Metro Infrastructure during Shield Tunneling Construction
por: Ran, L., et al.
Publicado: (2014) -
Numerical analysis and application of the construction method for the small interval tunnel in the turn line of metro
por: Song, Zhanping, et al.
Publicado: (2020) -
Rapid Acquisition and Identification of Structural Defects of Metro Tunnel
por: Ai, Qing, et al.
Publicado: (2019) -
Remote working and occupational stress: Effects on IT-enabled industry employees in Hyderabad Metro, India
por: Prasad, K.D.V., et al.
Publicado: (2023)