Cargando…

Evaluation de la performance du système de gestion logistique des intrants de lutte contre le paludisme dans le Département du Littoral, au Bénin, en 2017

INTRODUCTION: This study aimed to evaluate the performance of the logistics management system (LMS) of malaria control (MC) resources in the Littoral Department, Benin, in 2017. METHODS: In June 2017, we conducted a cross-sectional evaluative study focusing on the structures for the storage and the...

Descripción completa

Detalles Bibliográficos
Autores principales: Ouro-Koura, Abdou-Rahim, Sopoh, Emmanuel Ghislain, Sossa, Jerôme Charles, Glèlè-Ahanhanzo, Yolaine, Agueh, Victoire, Ouendo, Edgard-Marius, Ouedraogo, Laurent
Formato: Online Artículo Texto
Lenguaje:English
Publicado: The African Field Epidemiology Network 2018
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5987119/
https://www.ncbi.nlm.nih.gov/pubmed/29875942
http://dx.doi.org/10.11604/pamj.2018.29.61.14024
Descripción
Sumario:INTRODUCTION: This study aimed to evaluate the performance of the logistics management system (LMS) of malaria control (MC) resources in the Littoral Department, Benin, in 2017. METHODS: In June 2017, we conducted a cross-sectional evaluative study focusing on the structures for the storage and the disposal of MC resources as well as on staff involved in their management. The performance of the the logistics management system was evaluated on the basis of the observed compliance of the components and sub-components of the “Structure”, the “Process” and the “Results” with the norms and standards defined by the Ministry of Health. RESULTS: A total of 36 structures were investigated and secondary target was surveyed. It followed that 52,78% of the structures for the storage and the disposal of MC resources met the requirements for resources storage while only 33.33% of MC resources management staff were trained in logistics management. The performance of the logistics management system of MC resources was inadequate (compliance 59,13 % compared to the expected score). The structure, as well as the process were non-compliant with the standards ( 60,20% and 73.22% compared to the expected score respectively), leading to negative results (41.53% compared to the expected score). The most inadequate sub-component was the logistics management information system (LMIS). CONCLUSION: This study highlights the role of LMS for better performance of MC resources management. Particular attention should be given to this component.