An empirical study of collaborative capacity evaluation and scheduling optimization for a CPD project
In a collaborative product design project, reasonable resource allocation can shorten the development cycle and reduce cost. Team capacity evaluation and a task-team scheduling model are presented. A collaborative team capacity model is constructed, and a 2-tuple linguistic method is used to evaluat...
Autores principales: | Wang, Xiaolei, Ci, Tiejun, Tsai, Sang-Bing, Liu, Aijun, Chen, Quan |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2018
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6070215/ https://www.ncbi.nlm.nih.gov/pubmed/30067816 http://dx.doi.org/10.1371/journal.pone.0200753 |