Scheduling non-critical activities using multicriteria approach
In many projects the problem of selecting the start time of a non-critical activity arises. Usually it is possible to use the “as soon as possible” or “as late as possible” rules. In some situations, however, the result of such a decision depends on external factors such as exchange rate. This leads...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer Berlin Heidelberg
2018
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6105254/ https://www.ncbi.nlm.nih.gov/pubmed/30174553 http://dx.doi.org/10.1007/s10100-018-0542-y |
_version_ | 1783349631723241472 |
---|---|
author | Targiel, Krzysztof S. Nowak, Maciej Trzaskalik, Tadeusz |
author_facet | Targiel, Krzysztof S. Nowak, Maciej Trzaskalik, Tadeusz |
author_sort | Targiel, Krzysztof S. |
collection | PubMed |
description | In many projects the problem of selecting the start time of a non-critical activity arises. Usually it is possible to use the “as soon as possible” or “as late as possible” rules. In some situations, however, the result of such a decision depends on external factors such as exchange rate. This leads to an approach in which the problem of scheduling non-critical activities is solved using an expanded Cox–Ross–Rubinstein (CRR) binomial tree method. In the paper a bi-criteria problem of determining the start time of a non-critical activity is considered. We assume that the early start and the late start of the activity have been identified using Critical Path Method, but the project manager is free to select the time when the activity will actually be started. This decision cannot, however, be changed later, as it is associated with the allocation of key resources. Two main criteria are considered: cost and risk. While cost depends on exchange rate, risk increases with the delay of the start of the activity. The problem can be described as a dynamic process. We propose a new interactive technique for solving such a bi-criteria decision making problem under risk. The procedure uses trade-offs to identify a candidate solution. The CRR binomial method is applied to evaluate the cost of the activity. |
format | Online Article Text |
id | pubmed-6105254 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2018 |
publisher | Springer Berlin Heidelberg |
record_format | MEDLINE/PubMed |
spelling | pubmed-61052542018-08-30 Scheduling non-critical activities using multicriteria approach Targiel, Krzysztof S. Nowak, Maciej Trzaskalik, Tadeusz Cent Eur J Oper Res Original Paper In many projects the problem of selecting the start time of a non-critical activity arises. Usually it is possible to use the “as soon as possible” or “as late as possible” rules. In some situations, however, the result of such a decision depends on external factors such as exchange rate. This leads to an approach in which the problem of scheduling non-critical activities is solved using an expanded Cox–Ross–Rubinstein (CRR) binomial tree method. In the paper a bi-criteria problem of determining the start time of a non-critical activity is considered. We assume that the early start and the late start of the activity have been identified using Critical Path Method, but the project manager is free to select the time when the activity will actually be started. This decision cannot, however, be changed later, as it is associated with the allocation of key resources. Two main criteria are considered: cost and risk. While cost depends on exchange rate, risk increases with the delay of the start of the activity. The problem can be described as a dynamic process. We propose a new interactive technique for solving such a bi-criteria decision making problem under risk. The procedure uses trade-offs to identify a candidate solution. The CRR binomial method is applied to evaluate the cost of the activity. Springer Berlin Heidelberg 2018-04-27 2018 /pmc/articles/PMC6105254/ /pubmed/30174553 http://dx.doi.org/10.1007/s10100-018-0542-y Text en © The Author(s) 2018 Open AccessThis article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. |
spellingShingle | Original Paper Targiel, Krzysztof S. Nowak, Maciej Trzaskalik, Tadeusz Scheduling non-critical activities using multicriteria approach |
title | Scheduling non-critical activities using multicriteria approach |
title_full | Scheduling non-critical activities using multicriteria approach |
title_fullStr | Scheduling non-critical activities using multicriteria approach |
title_full_unstemmed | Scheduling non-critical activities using multicriteria approach |
title_short | Scheduling non-critical activities using multicriteria approach |
title_sort | scheduling non-critical activities using multicriteria approach |
topic | Original Paper |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6105254/ https://www.ncbi.nlm.nih.gov/pubmed/30174553 http://dx.doi.org/10.1007/s10100-018-0542-y |
work_keys_str_mv | AT targielkrzysztofs schedulingnoncriticalactivitiesusingmulticriteriaapproach AT nowakmaciej schedulingnoncriticalactivitiesusingmulticriteriaapproach AT trzaskaliktadeusz schedulingnoncriticalactivitiesusingmulticriteriaapproach |