Cargando…
Scheduling non-critical activities using multicriteria approach
In many projects the problem of selecting the start time of a non-critical activity arises. Usually it is possible to use the “as soon as possible” or “as late as possible” rules. In some situations, however, the result of such a decision depends on external factors such as exchange rate. This leads...
Autores principales: | Targiel, Krzysztof S., Nowak, Maciej, Trzaskalik, Tadeusz |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer Berlin Heidelberg
2018
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6105254/ https://www.ncbi.nlm.nih.gov/pubmed/30174553 http://dx.doi.org/10.1007/s10100-018-0542-y |
Ejemplares similares
-
Interactive Multiobjective Procedure for Mixed Problems and Its Application to Capacity Planning
por: Nowak, Maciej, et al.
Publicado: (2021) -
Multicriteria optimization
por: Ehrgott, Matthias, et al.
Publicado: (2000) -
Advances in multicriteria analysis
por: Pardalos, Panos, et al.
Publicado: (1995) -
Multicriteria optimization and engineering
por: Statnikov, Roman B, et al.
Publicado: (1995) -
Multicriteria Portfolio Management
por: Xidonas, Panos, et al.
Publicado: (2012)