Optimizing Workover Rig Fleet Sizing and Scheduling Using Deterministic and Stochastic Programming Models
[Image: see text] We present deterministic and stochastic programming models for the workover rig problem, one of the most challenging problems in the oil industry. In the deterministic approach, an integer linear programming model is used to determine the rig fleet size and schedule needed to servi...
Autores principales: | Fernández Pérez, Miguel A., Oliveira, Fabricio, Hamacher, Silvio |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
American Chemical
Society
2018
|
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6156096/ https://www.ncbi.nlm.nih.gov/pubmed/30270974 http://dx.doi.org/10.1021/acs.iecr.7b04500 |
Ejemplares similares
-
Deterministic and stochastic optimal control
por: Fleming, Wendell, et al.
Publicado: (1975) -
Timeliness Analysis of Coalbed Methane Workover for
Reducing Damage to Coal Reservoirs
por: Wang, Qingwei
Publicado: (2022) -
Dynamic optimization: deterministic and stochastic models
por: Hinderer, Karl, et al.
Publicado: (2016) -
Advances in stochastic and deterministic global optimization
por: Pardalos, Panos, et al.
Publicado: (2016) -
NATO Advanced Study and Research Institute on Theoretical Approaches to Scheduling Problems : Deterministic and stochastic scheduling
por: Dempster, Michael Alan Howarth, et al.
Publicado: (1982)