Cargando…

Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River

With the rapid development of China, water pollution is still a serious problem despite implementation of control measures. Reasonable water environment management measures are very important for improving water quality and controlling eutrophication. In this study, the coupled models of hydrodynami...

Descripción completa

Detalles Bibliográficos
Autores principales: Song, Weiwei, Fu, Xingqian, Pang, Yong, Song, Dahao, Xu, Qing, Zhang, Peng
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2018
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6211040/
https://www.ncbi.nlm.nih.gov/pubmed/30257493
http://dx.doi.org/10.3390/ijerph15102110
_version_ 1783367253175042048
author Song, Weiwei
Fu, Xingqian
Pang, Yong
Song, Dahao
Xu, Qing
Zhang, Peng
author_facet Song, Weiwei
Fu, Xingqian
Pang, Yong
Song, Dahao
Xu, Qing
Zhang, Peng
author_sort Song, Weiwei
collection PubMed
description With the rapid development of China, water pollution is still a serious problem despite implementation of control measures. Reasonable water environment management measures are very important for improving water quality and controlling eutrophication. In this study, the coupled models of hydrodynamics, water quality, and eutrophication were used to predict artificial Playground Lake water quality in the Zhenjiang, China. Recommended “unilateral” and “bilateral” river numerical models were constructed to simulate the water quality in the Playground Lake without or with water diversion by pump, sluice and push pump. Under “unilateral” and “bilateral” river layouts, total nitrogen and total phosphorus meet the landscape water requirement through water diversion. Tourist season in spring and summer and its suitable temperature result in heavier eutrophication, while winter is lighter. Under pumping condition, water quality and eutrophication of “unilateral” river is better than “bilateral” rivers. Under sluice diversion, the central landscape lake of “unilateral river” is not smooth, and water quality and eutrophication is inferior to the “bilateral”. When the water level exceeds the flood control level (4.1 m), priority 1 is launched to discharge water from the Playground Lake. During operation of playground, when water level is less than the minimum level (3.3 m), priority 2 is turned on for pumping diversion or sluice diversion to Playground Lake. After opening the Yangtze river diversion channel sluice, priority 3 is launched for sluice diversion to the Playground Lake. When the temperature is less than 15 °C, from 15 °C to 25 °C and higher than 25 °C, the water quality can be maintained for 15 days, 10 days and 7 days, respectively. Corresponding to the conditions of different priority levels, reasonable choices of scheduling measures under different conditions to improve the water quality and control eutrophication of the Playground Lake. This article is relevant for the environmental management of the artificial Playground Lake, and similar lakes elsewhere.
format Online
Article
Text
id pubmed-6211040
institution National Center for Biotechnology Information
language English
publishDate 2018
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-62110402018-11-02 Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River Song, Weiwei Fu, Xingqian Pang, Yong Song, Dahao Xu, Qing Zhang, Peng Int J Environ Res Public Health Article With the rapid development of China, water pollution is still a serious problem despite implementation of control measures. Reasonable water environment management measures are very important for improving water quality and controlling eutrophication. In this study, the coupled models of hydrodynamics, water quality, and eutrophication were used to predict artificial Playground Lake water quality in the Zhenjiang, China. Recommended “unilateral” and “bilateral” river numerical models were constructed to simulate the water quality in the Playground Lake without or with water diversion by pump, sluice and push pump. Under “unilateral” and “bilateral” river layouts, total nitrogen and total phosphorus meet the landscape water requirement through water diversion. Tourist season in spring and summer and its suitable temperature result in heavier eutrophication, while winter is lighter. Under pumping condition, water quality and eutrophication of “unilateral” river is better than “bilateral” rivers. Under sluice diversion, the central landscape lake of “unilateral river” is not smooth, and water quality and eutrophication is inferior to the “bilateral”. When the water level exceeds the flood control level (4.1 m), priority 1 is launched to discharge water from the Playground Lake. During operation of playground, when water level is less than the minimum level (3.3 m), priority 2 is turned on for pumping diversion or sluice diversion to Playground Lake. After opening the Yangtze river diversion channel sluice, priority 3 is launched for sluice diversion to the Playground Lake. When the temperature is less than 15 °C, from 15 °C to 25 °C and higher than 25 °C, the water quality can be maintained for 15 days, 10 days and 7 days, respectively. Corresponding to the conditions of different priority levels, reasonable choices of scheduling measures under different conditions to improve the water quality and control eutrophication of the Playground Lake. This article is relevant for the environmental management of the artificial Playground Lake, and similar lakes elsewhere. MDPI 2018-09-25 2018-10 /pmc/articles/PMC6211040/ /pubmed/30257493 http://dx.doi.org/10.3390/ijerph15102110 Text en © 2018 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Song, Weiwei
Fu, Xingqian
Pang, Yong
Song, Dahao
Xu, Qing
Zhang, Peng
Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River
title Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River
title_full Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River
title_fullStr Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River
title_full_unstemmed Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River
title_short Research on Water Environment Regulation of Artificial Playground Lake Interconnected Yangtze River
title_sort research on water environment regulation of artificial playground lake interconnected yangtze river
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6211040/
https://www.ncbi.nlm.nih.gov/pubmed/30257493
http://dx.doi.org/10.3390/ijerph15102110
work_keys_str_mv AT songweiwei researchonwaterenvironmentregulationofartificialplaygroundlakeinterconnectedyangtzeriver
AT fuxingqian researchonwaterenvironmentregulationofartificialplaygroundlakeinterconnectedyangtzeriver
AT pangyong researchonwaterenvironmentregulationofartificialplaygroundlakeinterconnectedyangtzeriver
AT songdahao researchonwaterenvironmentregulationofartificialplaygroundlakeinterconnectedyangtzeriver
AT xuqing researchonwaterenvironmentregulationofartificialplaygroundlakeinterconnectedyangtzeriver
AT zhangpeng researchonwaterenvironmentregulationofartificialplaygroundlakeinterconnectedyangtzeriver