Cargando…
Start-Up of a Biofilter in a Full-Scale Groundwater Treatment Plant for Iron and Manganese Removal
In recent years, biological purification technology has been widely developed in the process of iron and manganese removal from groundwater. The cultivation and maturation of the biological filter layer are key for biological iron and manganese removal processes. The time needed for maturation varie...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2019
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6427540/ https://www.ncbi.nlm.nih.gov/pubmed/30818751 http://dx.doi.org/10.3390/ijerph16050698 |
Sumario: | In recent years, biological purification technology has been widely developed in the process of iron and manganese removal from groundwater. The cultivation and maturation of the biological filter layer are key for biological iron and manganese removal processes. The time needed for maturation varies significantly with the water quality, filter and filter media conditions and operation parameters; sometimes it takes only one or two months, sometime more than half a year. In this paper, the feasibility of adopting an intermittent operation for the cultivation of biofilter was investigated with productive filters in a groundwater treatment plant, and the comparative test of the filter column was conducted. The results showed that the intermittent operation had little effect on the cultivation of the biofilter because dissolved oxygen would be gradually exhausted during the filter-suspension process, making the filter layer anaerobic, thus possibly inhibiting the growth and reproduction of IMOB (Iron and Manganese Oxidizing Bacteria). At the same time, the test shows that when the mature biological filter needs the suspension operation, the emptying method should be considered to avoid the destruction of the biological layer. |
---|