Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence
In this study, a three-dimensional (3D) response of anchored sheet pile walls was investigated on double-anchored sheet pile system during soils excavation and tunnel construction sequence. This construction procedure is executed in areas front and adjacent the sheet pile walls. This paper focused o...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2019
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6431738/ https://www.ncbi.nlm.nih.gov/pubmed/30957039 http://dx.doi.org/10.1016/j.heliyon.2019.e01348 |
_version_ | 1783405975117496320 |
---|---|
author | Fall, Massamba Gao, Zhengguo Ndiaye, Becaye Cissokho |
author_facet | Fall, Massamba Gao, Zhengguo Ndiaye, Becaye Cissokho |
author_sort | Fall, Massamba |
collection | PubMed |
description | In this study, a three-dimensional (3D) response of anchored sheet pile walls was investigated on double-anchored sheet pile system during soils excavation and tunnel construction sequence. This construction procedure is executed in areas front and adjacent the sheet pile walls. This paper focused on both areas of construction effects on the sheet piles. This numerical study aimed at the evaluation of the variation of bottom wall bending moment, top wall lateral and vertical displacements and anchor reactions forces exerted in the sheet piles. This paper also described the variation of the total anchor's reactions forces from the upper and lower anchors rows. A parametric effect such as upper and lower anchors rows distance was also performed to evaluate the variation of the wall bending moment, displacement and anchors total forces. The analysis results indicated that the reactions forces developed in the lower anchor rods are always higher than those developed in the upper anchor rods. The higher the distance between the upper and the bottom anchors the lower the displacement of the top wall in any stage of the construction. The minimum bottom walls bending moment is developed in the case where the distance between the anchor's rows divided by the wall height is 0.51. Positioning the upper anchors at 0.15 and the lower at 0.39 the wall height from the top wall will induce minimum top wall vertical displacement during soil excavation. This paper presents the results and findings of the parametric study performed. |
format | Online Article Text |
id | pubmed-6431738 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2019 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-64317382019-04-05 Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence Fall, Massamba Gao, Zhengguo Ndiaye, Becaye Cissokho Heliyon Article In this study, a three-dimensional (3D) response of anchored sheet pile walls was investigated on double-anchored sheet pile system during soils excavation and tunnel construction sequence. This construction procedure is executed in areas front and adjacent the sheet pile walls. This paper focused on both areas of construction effects on the sheet piles. This numerical study aimed at the evaluation of the variation of bottom wall bending moment, top wall lateral and vertical displacements and anchor reactions forces exerted in the sheet piles. This paper also described the variation of the total anchor's reactions forces from the upper and lower anchors rows. A parametric effect such as upper and lower anchors rows distance was also performed to evaluate the variation of the wall bending moment, displacement and anchors total forces. The analysis results indicated that the reactions forces developed in the lower anchor rods are always higher than those developed in the upper anchor rods. The higher the distance between the upper and the bottom anchors the lower the displacement of the top wall in any stage of the construction. The minimum bottom walls bending moment is developed in the case where the distance between the anchor's rows divided by the wall height is 0.51. Positioning the upper anchors at 0.15 and the lower at 0.39 the wall height from the top wall will induce minimum top wall vertical displacement during soil excavation. This paper presents the results and findings of the parametric study performed. Elsevier 2019-03-20 /pmc/articles/PMC6431738/ /pubmed/30957039 http://dx.doi.org/10.1016/j.heliyon.2019.e01348 Text en © 2019 The Authors http://creativecommons.org/licenses/by/4.0/ This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Fall, Massamba Gao, Zhengguo Ndiaye, Becaye Cissokho Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
title | Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
title_full | Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
title_fullStr | Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
title_full_unstemmed | Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
title_short | Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
title_sort | three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6431738/ https://www.ncbi.nlm.nih.gov/pubmed/30957039 http://dx.doi.org/10.1016/j.heliyon.2019.e01348 |
work_keys_str_mv | AT fallmassamba threedimensionalresponseofdoubleanchoredsheetpilewallssubjectedtoexcavationandconstructionsequence AT gaozhengguo threedimensionalresponseofdoubleanchoredsheetpilewallssubjectedtoexcavationandconstructionsequence AT ndiayebecayecissokho threedimensionalresponseofdoubleanchoredsheetpilewallssubjectedtoexcavationandconstructionsequence |