Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System

When there are railway tunnels on both sides of a valley, a bridge is usually built to let trains pass. However, if the valley is very close to an urban area, building an open-cut tunnel at the portal and then backfilling it to create available land resources for the city and to prevent excavation s...

Descripción completa

Detalles Bibliográficos
Autores principales: Xu, Tianyuan, Wang, Mingnian, Yu, Li, Lv, Cheng, Dong, Yucang, Tian, Yuan
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2019
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6480922/
https://www.ncbi.nlm.nih.gov/pubmed/30934699
http://dx.doi.org/10.3390/s19071487
_version_ 1783413677304578048
author Xu, Tianyuan
Wang, Mingnian
Yu, Li
Lv, Cheng
Dong, Yucang
Tian, Yuan
author_facet Xu, Tianyuan
Wang, Mingnian
Yu, Li
Lv, Cheng
Dong, Yucang
Tian, Yuan
author_sort Xu, Tianyuan
collection PubMed
description When there are railway tunnels on both sides of a valley, a bridge is usually built to let trains pass. However, if the valley is very close to an urban area, building an open-cut tunnel at the portal and then backfilling it to create available land resources for the city and to prevent excavation slag from polluting the environment would be a wise choice. This has led to the emergence of a new type of structure, namely, the high-fill open-cut tunnel. In this paper, by performing an automatic long-term field test on the first high-fill open-cut tunnel using a bilayer design in China, the variations of earth pressure and structural internal force during the backfilling process were obtained, and different tunnel foundation types were studied. The results showed that the earth pressure significantly exceeded the soil column weight, with a maximum earth pressure coefficient between 1.341 and 2.278. During the backfilling process, the earth pressure coefficient increased at first and then decreased slowly to a relatively stable value, and a stiffer foundation would make the structure bear higher earth pressure (1.69 times the normal one observed during monitoring). The change of internal force had two stages during backfilling: before the backfill soil reached the arch crown, the internal force of the lining changed slowly and then grew linearly as the backfill process continued. Moreover, the axial force ratio of the inner and outer linings was close to their thickness proportion, and the interaction mode between the two layers was very similar to the composite beam.
format Online
Article
Text
id pubmed-6480922
institution National Center for Biotechnology Information
language English
publishDate 2019
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-64809222019-04-29 Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System Xu, Tianyuan Wang, Mingnian Yu, Li Lv, Cheng Dong, Yucang Tian, Yuan Sensors (Basel) Article When there are railway tunnels on both sides of a valley, a bridge is usually built to let trains pass. However, if the valley is very close to an urban area, building an open-cut tunnel at the portal and then backfilling it to create available land resources for the city and to prevent excavation slag from polluting the environment would be a wise choice. This has led to the emergence of a new type of structure, namely, the high-fill open-cut tunnel. In this paper, by performing an automatic long-term field test on the first high-fill open-cut tunnel using a bilayer design in China, the variations of earth pressure and structural internal force during the backfilling process were obtained, and different tunnel foundation types were studied. The results showed that the earth pressure significantly exceeded the soil column weight, with a maximum earth pressure coefficient between 1.341 and 2.278. During the backfilling process, the earth pressure coefficient increased at first and then decreased slowly to a relatively stable value, and a stiffer foundation would make the structure bear higher earth pressure (1.69 times the normal one observed during monitoring). The change of internal force had two stages during backfilling: before the backfill soil reached the arch crown, the internal force of the lining changed slowly and then grew linearly as the backfill process continued. Moreover, the axial force ratio of the inner and outer linings was close to their thickness proportion, and the interaction mode between the two layers was very similar to the composite beam. MDPI 2019-03-27 /pmc/articles/PMC6480922/ /pubmed/30934699 http://dx.doi.org/10.3390/s19071487 Text en © 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Xu, Tianyuan
Wang, Mingnian
Yu, Li
Lv, Cheng
Dong, Yucang
Tian, Yuan
Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System
title Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System
title_full Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System
title_fullStr Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System
title_full_unstemmed Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System
title_short Research on the Earth Pressure and Internal Force of a High-Fill Open-Cut Tunnel Using a Bilayer Lining Design: A Field Test Using an FBG Automatic Data Acquisition System
title_sort research on the earth pressure and internal force of a high-fill open-cut tunnel using a bilayer lining design: a field test using an fbg automatic data acquisition system
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6480922/
https://www.ncbi.nlm.nih.gov/pubmed/30934699
http://dx.doi.org/10.3390/s19071487
work_keys_str_mv AT xutianyuan researchontheearthpressureandinternalforceofahighfillopencuttunnelusingabilayerliningdesignafieldtestusinganfbgautomaticdataacquisitionsystem
AT wangmingnian researchontheearthpressureandinternalforceofahighfillopencuttunnelusingabilayerliningdesignafieldtestusinganfbgautomaticdataacquisitionsystem
AT yuli researchontheearthpressureandinternalforceofahighfillopencuttunnelusingabilayerliningdesignafieldtestusinganfbgautomaticdataacquisitionsystem
AT lvcheng researchontheearthpressureandinternalforceofahighfillopencuttunnelusingabilayerliningdesignafieldtestusinganfbgautomaticdataacquisitionsystem
AT dongyucang researchontheearthpressureandinternalforceofahighfillopencuttunnelusingabilayerliningdesignafieldtestusinganfbgautomaticdataacquisitionsystem
AT tianyuan researchontheearthpressureandinternalforceofahighfillopencuttunnelusingabilayerliningdesignafieldtestusinganfbgautomaticdataacquisitionsystem