Cargando…

Evaluation of sexual and gender-based violence program in Harare City, Zimbabwe, 2016: a descriptive cross-sectional study

INTRODUCTION: In Zimbabwe, there is a gap between sexual violence (SV) survivors' health care needs versus the existing facilities. Harare city started Sexual Gender Based Violence (SGBV) project in 2011, with the aim to reduce SV morbidity.Only 592 (42%) of 1425 SV survivors reported for medic...

Descripción completa

Detalles Bibliográficos
Autores principales: Sithole, Zvanaka, Gombe, Notion Tafara, Juru, Tsitsi, Chonzi, Prosper, Shambira, Gerald, Nsubuga, Peter, Tshimanga, Mufuta
Formato: Online Artículo Texto
Lenguaje:English
Publicado: The African Field Epidemiology Network 2018
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6492207/
https://www.ncbi.nlm.nih.gov/pubmed/31086643
http://dx.doi.org/10.11604/pamj.2018.31.200.14791
Descripción
Sumario:INTRODUCTION: In Zimbabwe, there is a gap between sexual violence (SV) survivors' health care needs versus the existing facilities. Harare city started Sexual Gender Based Violence (SGBV) project in 2011, with the aim to reduce SV morbidity.Only 592 (42%) of 1425 SV survivors reported for medical services within 72 hours in 2015. HIV post-exposure prophylaxis (PEP) is effective within 72hours of post exposure. We evaluated the program performance in Harare city. METHODS: We conducted a process-outcome evaluation using a logic model. We purposively recruited all eight SGBV sites and key informants. We randomly selected 27nurses into the study. Interviewer-administered questionnaires and checklists were used to collect data. To generate frequencies, means and proportions we used Epi info 7. RESULTS: The program adequately received inputs except for counselling rooms (1/8). About 4285 survivors were recorded from 2013-2016. Of these, 97% were counselled, 93% received HIV test, 41% reported to the clinic within 72hrs of post-rape, and 12% received PEP. About 16% of the total survivors were followed up. The programme failed to meet its targets on decentralised sites (8/10), awareness campaigns(16/32) and sensitisation activities(16/32). About 500(12.5%) IEC materials were distributed. All 96-targeted supervisory visits were achieved. Two ofeight district supervisors were trained. Majority of health workers (25/35) citedlack of awareness as major reasons for underperformance. CONCLUSION: Availability of resources did not translate to program performance. Most survivors were not reporting to the clinic timeously due to the low level of awareness of the programme to the community, hence were not protected from getting HIV through PEP. The programme was not well disseminated, as most supervisors were not trained. Following this evaluation, we distributed150 IEC materials to each of the eight facilities. A follow-up study on outcomes of clients referred for services and training of district officers were recommended.