Cargando…
Experimental data from strengthening bamboo reinforcement using adhesives and hose-clamps
The bamboo treatment process starts with cutting, soaking in water, draining in free air, reinforcing in the fireplace, first-stage adhesive coating, hose-clamp installation, second-stage adhesive coating, and sand resurfacing. Data was taken from experimental testing of bamboo materials and bond st...
Autor principal: | Muhtar |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2019
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6889368/ https://www.ncbi.nlm.nih.gov/pubmed/31828188 http://dx.doi.org/10.1016/j.dib.2019.104827 |
Ejemplares similares
-
Numerical validation data of tensile stress zones and crack zones in bamboo reinforced concrete beams using the Fortran PowerStation 4.0 program
por: Muhtar
Publicado: (2020) -
Experimental data on the splitting tensile strength of bamboo reinforced lateritic concrete using different culm sizes
por: Atoyebi, Olumoyewa Dotun, et al.
Publicado: (2018) -
Scarlet Hose
Publicado: (1870) -
Hose practices
por: International Fire Service Training Association
Publicado: (1988) -
The effect of nuclear radiation on hoses
por: Van de Voorde, M H, et al.
Publicado: (1968)