Cargando…
Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time
In recent years, owing to the increase of extreme climate events due to global climate change, the foundational erosion of old bridges has become increasingly serious. When typhoons have approached, bridge foundations have been broken due to the insufficient bearing capacity of the bridge column. Th...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2019
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6935760/ https://www.ncbi.nlm.nih.gov/pubmed/31805645 http://dx.doi.org/10.3390/s19235293 |
_version_ | 1783483626198925312 |
---|---|
author | Fang, Yao Min Chou, Tien Yin Hoang, Thanh Van Lee, Bing Jean |
author_facet | Fang, Yao Min Chou, Tien Yin Hoang, Thanh Van Lee, Bing Jean |
author_sort | Fang, Yao Min |
collection | PubMed |
description | In recent years, owing to the increase of extreme climate events due to global climate change, the foundational erosion of old bridges has become increasingly serious. When typhoons have approached, bridge foundations have been broken due to the insufficient bearing capacity of the bridge column. The bridge bottoming method involves rebuilding the lower structure while keeping the bridge surface open, and transferring the load of the bridge temporarily to the temporary support frame to remove the bridge base or damaged part with insufficient strength. This is followed by replacing the removed bridge base with a new bridge foundation that meets the requirements of flood and earthquake resistance. Meanwhile, monitoring plans should be coordinated during construction using the bottoming method to ensure the safety of the bridge. In the case of this study, the No. 3 line Wuxi Bridge had a maximum bridge age of 40 years, where the maximum exposed length of the foundation was up to 7.5 m, resulting in insufficient flood and earthquake resistance. Consequently, a reconstruction plan was carried out on this bridge. This study took the reconstruction of Wuxi Bridge as the object and established a finite element model using the SAP 2000 computer software based on the secondary reconstruction design of the Wuxi Bridge. The domestic bridge design specification was used as the basis for the static and dynamic analyses of the Wuxi Bridge model. As a result of the analysis, the management value of the monitoring instrument during construction was determined. The calculated management values were compared with the monitoring data during the construction period to determine the rationality of the management values and to explore changes in the behavior of the old bridges and temporary support bridges. |
format | Online Article Text |
id | pubmed-6935760 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2019 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-69357602019-12-31 Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time Fang, Yao Min Chou, Tien Yin Hoang, Thanh Van Lee, Bing Jean Sensors (Basel) Article In recent years, owing to the increase of extreme climate events due to global climate change, the foundational erosion of old bridges has become increasingly serious. When typhoons have approached, bridge foundations have been broken due to the insufficient bearing capacity of the bridge column. The bridge bottoming method involves rebuilding the lower structure while keeping the bridge surface open, and transferring the load of the bridge temporarily to the temporary support frame to remove the bridge base or damaged part with insufficient strength. This is followed by replacing the removed bridge base with a new bridge foundation that meets the requirements of flood and earthquake resistance. Meanwhile, monitoring plans should be coordinated during construction using the bottoming method to ensure the safety of the bridge. In the case of this study, the No. 3 line Wuxi Bridge had a maximum bridge age of 40 years, where the maximum exposed length of the foundation was up to 7.5 m, resulting in insufficient flood and earthquake resistance. Consequently, a reconstruction plan was carried out on this bridge. This study took the reconstruction of Wuxi Bridge as the object and established a finite element model using the SAP 2000 computer software based on the secondary reconstruction design of the Wuxi Bridge. The domestic bridge design specification was used as the basis for the static and dynamic analyses of the Wuxi Bridge model. As a result of the analysis, the management value of the monitoring instrument during construction was determined. The calculated management values were compared with the monitoring data during the construction period to determine the rationality of the management values and to explore changes in the behavior of the old bridges and temporary support bridges. MDPI 2019-12-01 /pmc/articles/PMC6935760/ /pubmed/31805645 http://dx.doi.org/10.3390/s19235293 Text en © 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Fang, Yao Min Chou, Tien Yin Hoang, Thanh Van Lee, Bing Jean Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time |
title | Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time |
title_full | Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time |
title_fullStr | Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time |
title_full_unstemmed | Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time |
title_short | Automatic Management and Monitoring of Bridge Lifting: A Method of Changing Engineering in Real-Time |
title_sort | automatic management and monitoring of bridge lifting: a method of changing engineering in real-time |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6935760/ https://www.ncbi.nlm.nih.gov/pubmed/31805645 http://dx.doi.org/10.3390/s19235293 |
work_keys_str_mv | AT fangyaomin automaticmanagementandmonitoringofbridgeliftingamethodofchangingengineeringinrealtime AT choutienyin automaticmanagementandmonitoringofbridgeliftingamethodofchangingengineeringinrealtime AT hoangthanhvan automaticmanagementandmonitoringofbridgeliftingamethodofchangingengineeringinrealtime AT leebingjean automaticmanagementandmonitoringofbridgeliftingamethodofchangingengineeringinrealtime |