Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions

This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and rel...

Descripción completa

Detalles Bibliográficos
Autores principales: Barghi, Behrad, Shadrokh sikari, Shahram
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6948246/
https://www.ncbi.nlm.nih.gov/pubmed/31922046
http://dx.doi.org/10.1016/j.heliyon.2019.e03097
_version_ 1783485705768402944
author Barghi, Behrad
Shadrokh sikari, Shahram
author_facet Barghi, Behrad
Shadrokh sikari, Shahram
author_sort Barghi, Behrad
collection PubMed
description This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and related positions in Neyr Perse Company. After reviewing the literature and the Project Management Body of Knowledge (PMBOK), 32 risk factors were identified and their number reduced to 17 risks using the expert opinions via the fuzzy Delphi technique run through three stages. The results of the confirmatory factor analysis showed that all risks were confirmed by the members of the research sample. Then the identified risks were structured and ranked using fuzzy DEMATEL and fuzzy ANP techniques. The final results of the study showed that the political and economic sanctions had the highest weight followed by foreign investors' attraction and the lack of regional infrastructure.
format Online
Article
Text
id pubmed-6948246
institution National Center for Biotechnology Information
language English
publishDate 2020
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-69482462020-01-09 Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions Barghi, Behrad Shadrokh sikari, Shahram Heliyon Article This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and related positions in Neyr Perse Company. After reviewing the literature and the Project Management Body of Knowledge (PMBOK), 32 risk factors were identified and their number reduced to 17 risks using the expert opinions via the fuzzy Delphi technique run through three stages. The results of the confirmatory factor analysis showed that all risks were confirmed by the members of the research sample. Then the identified risks were structured and ranked using fuzzy DEMATEL and fuzzy ANP techniques. The final results of the study showed that the political and economic sanctions had the highest weight followed by foreign investors' attraction and the lack of regional infrastructure. Elsevier 2020-01-03 /pmc/articles/PMC6948246/ /pubmed/31922046 http://dx.doi.org/10.1016/j.heliyon.2019.e03097 Text en © 2019 The Authors http://creativecommons.org/licenses/by-nc-nd/4.0/ This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
spellingShingle Article
Barghi, Behrad
Shadrokh sikari, Shahram
Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
title Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
title_full Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
title_fullStr Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
title_full_unstemmed Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
title_short Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
title_sort qualitative and quantitative project risk assessment using a hybrid pmbok model developed under uncertainty conditions
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6948246/
https://www.ncbi.nlm.nih.gov/pubmed/31922046
http://dx.doi.org/10.1016/j.heliyon.2019.e03097
work_keys_str_mv AT barghibehrad qualitativeandquantitativeprojectriskassessmentusingahybridpmbokmodeldevelopedunderuncertaintyconditions
AT shadrokhsikarishahram qualitativeandquantitativeprojectriskassessmentusingahybridpmbokmodeldevelopedunderuncertaintyconditions