Cargando…
Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and rel...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2020
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6948246/ https://www.ncbi.nlm.nih.gov/pubmed/31922046 http://dx.doi.org/10.1016/j.heliyon.2019.e03097 |
_version_ | 1783485705768402944 |
---|---|
author | Barghi, Behrad Shadrokh sikari, Shahram |
author_facet | Barghi, Behrad Shadrokh sikari, Shahram |
author_sort | Barghi, Behrad |
collection | PubMed |
description | This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and related positions in Neyr Perse Company. After reviewing the literature and the Project Management Body of Knowledge (PMBOK), 32 risk factors were identified and their number reduced to 17 risks using the expert opinions via the fuzzy Delphi technique run through three stages. The results of the confirmatory factor analysis showed that all risks were confirmed by the members of the research sample. Then the identified risks were structured and ranked using fuzzy DEMATEL and fuzzy ANP techniques. The final results of the study showed that the political and economic sanctions had the highest weight followed by foreign investors' attraction and the lack of regional infrastructure. |
format | Online Article Text |
id | pubmed-6948246 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2020 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-69482462020-01-09 Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions Barghi, Behrad Shadrokh sikari, Shahram Heliyon Article This study presented a qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions. Accordingly, an exploratory and applied research design was employed in this study. The research sample included 15 experienced staff working in main and related positions in Neyr Perse Company. After reviewing the literature and the Project Management Body of Knowledge (PMBOK), 32 risk factors were identified and their number reduced to 17 risks using the expert opinions via the fuzzy Delphi technique run through three stages. The results of the confirmatory factor analysis showed that all risks were confirmed by the members of the research sample. Then the identified risks were structured and ranked using fuzzy DEMATEL and fuzzy ANP techniques. The final results of the study showed that the political and economic sanctions had the highest weight followed by foreign investors' attraction and the lack of regional infrastructure. Elsevier 2020-01-03 /pmc/articles/PMC6948246/ /pubmed/31922046 http://dx.doi.org/10.1016/j.heliyon.2019.e03097 Text en © 2019 The Authors http://creativecommons.org/licenses/by-nc-nd/4.0/ This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). |
spellingShingle | Article Barghi, Behrad Shadrokh sikari, Shahram Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions |
title | Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions |
title_full | Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions |
title_fullStr | Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions |
title_full_unstemmed | Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions |
title_short | Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions |
title_sort | qualitative and quantitative project risk assessment using a hybrid pmbok model developed under uncertainty conditions |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC6948246/ https://www.ncbi.nlm.nih.gov/pubmed/31922046 http://dx.doi.org/10.1016/j.heliyon.2019.e03097 |
work_keys_str_mv | AT barghibehrad qualitativeandquantitativeprojectriskassessmentusingahybridpmbokmodeldevelopedunderuncertaintyconditions AT shadrokhsikarishahram qualitativeandquantitativeprojectriskassessmentusingahybridpmbokmodeldevelopedunderuncertaintyconditions |