Monitored deformation data during the construction of an urban subway
The dataset is related to the ground surface and structure deformation during the construction of Chongqing subway line 9 in four months. The tunnel was constructed using drilling and blasting method as well as the tunnel boring machine (TBM). A systematic monitoring system was set in the site and i...
Autores principales: | Hao, Xiaotian, Wang, Bin, Wang, Hailong |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2020
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7005514/ https://www.ncbi.nlm.nih.gov/pubmed/32055656 http://dx.doi.org/10.1016/j.dib.2020.105126 |
Ejemplares similares
-
Study on ground settlement and structural deformation for large span subway station using a new pre-supporting system
por: Jia, Pengjiao, et al.
Publicado: (2019) -
On-site measurement and environmental impact of vibration caused by construction of double-shield TBM tunnel in urban subway
por: Wang, Zhenyong, et al.
Publicado: (2023) -
Characterization of Urban Subway Microenvironment Exposure—A Case of Nanjing in China
por: Mao, Peng, et al.
Publicado: (2019) -
Monitoring and
Prediction of Horizontal Displacement
of Underground Enclosure Piles in Subway Foundation Pits
por: Dong, Yue, et al.
Publicado: (2023) -
Accumulative Deformation Characteristics and Microstructure of Saturated Soft Clay under Cross-River Subway Loading
por: Yu, Jiangang, et al.
Publicado: (2021)