Cargando…

Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique

A large‐scale solar photovoltaic system (LSS PV) aims to reduce the gap as Malaysia plans to shift electricity generation from conventional sources like fossil fuels to renewable energy sources. The government plans to increase renewable energy to 20% of the generation mix by 2025. The first and sec...

Descripción completa

Detalles Bibliográficos
Autores principales: Mohanan, Mahesh, Go, Yun Ii
Formato: Online Artículo Texto
Lenguaje:English
Publicado: John Wiley and Sons Inc. 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7117848/
https://www.ncbi.nlm.nih.gov/pubmed/32257382
http://dx.doi.org/10.1002/gch2.201900093
_version_ 1783514454404628480
author Mohanan, Mahesh
Go, Yun Ii
author_facet Mohanan, Mahesh
Go, Yun Ii
author_sort Mohanan, Mahesh
collection PubMed
description A large‐scale solar photovoltaic system (LSS PV) aims to reduce the gap as Malaysia plans to shift electricity generation from conventional sources like fossil fuels to renewable energy sources. The government plans to increase renewable energy to 20% of the generation mix by 2025. The first and second round of Malaysia's LSS programme has 958 MW of PV projects to be realized by 2020. The third round of the LSS program goes for an aggregate capacity of 500 MW. Being an intermittent source of energy, the major complication is with grid integration of the LSS PV system into the national power grid. This research aims to identify an optimum power system management scheme for LSS in Malaysia to stabilize voltage fluctuations by utilizing IEEE bus configuration. The simulation and planning of network type is based on PSS/E and PVSyst. The expected outcome of this research is to develop a solution for LSS grid integration with minimal loss in the system and in accordance with electricity standards as per Malaysian grid code. Additionally, the harmony of incorporating power electronic devices for reactive power compensation is tested. This work can be stated as a reference model for utility provider in other countries having similar network and grid configuration.
format Online
Article
Text
id pubmed-7117848
institution National Center for Biotechnology Information
language English
publishDate 2020
publisher John Wiley and Sons Inc.
record_format MEDLINE/PubMed
spelling pubmed-71178482020-04-03 Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique Mohanan, Mahesh Go, Yun Ii Glob Chall Full Papers A large‐scale solar photovoltaic system (LSS PV) aims to reduce the gap as Malaysia plans to shift electricity generation from conventional sources like fossil fuels to renewable energy sources. The government plans to increase renewable energy to 20% of the generation mix by 2025. The first and second round of Malaysia's LSS programme has 958 MW of PV projects to be realized by 2020. The third round of the LSS program goes for an aggregate capacity of 500 MW. Being an intermittent source of energy, the major complication is with grid integration of the LSS PV system into the national power grid. This research aims to identify an optimum power system management scheme for LSS in Malaysia to stabilize voltage fluctuations by utilizing IEEE bus configuration. The simulation and planning of network type is based on PSS/E and PVSyst. The expected outcome of this research is to develop a solution for LSS grid integration with minimal loss in the system and in accordance with electricity standards as per Malaysian grid code. Additionally, the harmony of incorporating power electronic devices for reactive power compensation is tested. This work can be stated as a reference model for utility provider in other countries having similar network and grid configuration. John Wiley and Sons Inc. 2020-01-09 /pmc/articles/PMC7117848/ /pubmed/32257382 http://dx.doi.org/10.1002/gch2.201900093 Text en © 2020 The Authors. Published by WILEY‐VCH Verlag GmbH & Co. KGaA, Weinheim This is an open access article under the terms of the http://creativecommons.org/licenses/by/4.0/ License, which permits use, distribution and reproduction in any medium, provided the original work is properly cited.
spellingShingle Full Papers
Mohanan, Mahesh
Go, Yun Ii
Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique
title Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique
title_full Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique
title_fullStr Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique
title_full_unstemmed Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique
title_short Optimized Power System Management Scheme for LSS PV Grid Integration in Malaysia Using Reactive Power Compensation Technique
title_sort optimized power system management scheme for lss pv grid integration in malaysia using reactive power compensation technique
topic Full Papers
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7117848/
https://www.ncbi.nlm.nih.gov/pubmed/32257382
http://dx.doi.org/10.1002/gch2.201900093
work_keys_str_mv AT mohananmahesh optimizedpowersystemmanagementschemeforlsspvgridintegrationinmalaysiausingreactivepowercompensationtechnique
AT goyunii optimizedpowersystemmanagementschemeforlsspvgridintegrationinmalaysiausingreactivepowercompensationtechnique