Cargando…

Data needed for assessing water footprint of steel production

The data presented in this paper offer the information needed for assessing the water footprint of steel production. The data provided here are related to the research paper, “An Improved Water Footprint Model of Steel Production Concerning Virtual Water of Personnel: The Case of Iran” [1]. The data...

Descripción completa

Detalles Bibliográficos
Autores principales: Nezamoleslami, Reza, Hosseinian, S. Mahdi
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7152714/
https://www.ncbi.nlm.nih.gov/pubmed/32300624
http://dx.doi.org/10.1016/j.dib.2020.105461
_version_ 1783521538237005824
author Nezamoleslami, Reza
Hosseinian, S. Mahdi
author_facet Nezamoleslami, Reza
Hosseinian, S. Mahdi
author_sort Nezamoleslami, Reza
collection PubMed
description The data presented in this paper offer the information needed for assessing the water footprint of steel production. The data provided here are related to the research paper, “An Improved Water Footprint Model of Steel Production Concerning Virtual Water of Personnel: The Case of Iran” [1]. The data were collected form analysing a case study and reviewing the relevant literature. The case study data were collected from a large steel plant in Iran. All information received from this plant is related to 2017. The primary data were collected by interviewing the head of the research and development of the plant. All relevant formal documents of the plant and information on its web site were also reviewed. For data related to the water footprint of energy and raw materials, used for steel production, the relevant studies were reviewed.
format Online
Article
Text
id pubmed-7152714
institution National Center for Biotechnology Information
language English
publishDate 2020
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-71527142020-04-16 Data needed for assessing water footprint of steel production Nezamoleslami, Reza Hosseinian, S. Mahdi Data Brief Environmental Science The data presented in this paper offer the information needed for assessing the water footprint of steel production. The data provided here are related to the research paper, “An Improved Water Footprint Model of Steel Production Concerning Virtual Water of Personnel: The Case of Iran” [1]. The data were collected form analysing a case study and reviewing the relevant literature. The case study data were collected from a large steel plant in Iran. All information received from this plant is related to 2017. The primary data were collected by interviewing the head of the research and development of the plant. All relevant formal documents of the plant and information on its web site were also reviewed. For data related to the water footprint of energy and raw materials, used for steel production, the relevant studies were reviewed. Elsevier 2020-03-20 /pmc/articles/PMC7152714/ /pubmed/32300624 http://dx.doi.org/10.1016/j.dib.2020.105461 Text en © 2020 The Authors http://creativecommons.org/licenses/by/4.0/ This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Environmental Science
Nezamoleslami, Reza
Hosseinian, S. Mahdi
Data needed for assessing water footprint of steel production
title Data needed for assessing water footprint of steel production
title_full Data needed for assessing water footprint of steel production
title_fullStr Data needed for assessing water footprint of steel production
title_full_unstemmed Data needed for assessing water footprint of steel production
title_short Data needed for assessing water footprint of steel production
title_sort data needed for assessing water footprint of steel production
topic Environmental Science
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7152714/
https://www.ncbi.nlm.nih.gov/pubmed/32300624
http://dx.doi.org/10.1016/j.dib.2020.105461
work_keys_str_mv AT nezamoleslamireza dataneededforassessingwaterfootprintofsteelproduction
AT hosseiniansmahdi dataneededforassessingwaterfootprintofsteelproduction