Cargando…

O3 highlights

As the third LIGO–Virgo operating run (O3) finishes earlier than planned owing to the COVID-19 pandemic, we look at the ups and down of the past 12 months.

Detalles Bibliográficos
Autor principal: Georgescu, Iulia
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7163914/
https://www.ncbi.nlm.nih.gov/pubmed/33728400
http://dx.doi.org/10.1038/s42254-020-0179-3
Descripción
Sumario:As the third LIGO–Virgo operating run (O3) finishes earlier than planned owing to the COVID-19 pandemic, we look at the ups and down of the past 12 months.