Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods

The present work aimed to study the effects of temperature changes and concrete creep on I-shaped steel–concrete composite continuous girder bridges during construction and operation processes. This study combined structural health monitoring data, an ANSYS finite element simulation, and the age-adj...

Descripción completa

Detalles Bibliográficos
Autores principales: Wang, Guang-Ming, Zhu, Li, Zhou, Guang-Pan, Han, Bing, Ji, Wen-Yu
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2020
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7254365/
https://www.ncbi.nlm.nih.gov/pubmed/32375242
http://dx.doi.org/10.3390/ma13092123
_version_ 1783539528138489856
author Wang, Guang-Ming
Zhu, Li
Zhou, Guang-Pan
Han, Bing
Ji, Wen-Yu
author_facet Wang, Guang-Ming
Zhu, Li
Zhou, Guang-Pan
Han, Bing
Ji, Wen-Yu
author_sort Wang, Guang-Ming
collection PubMed
description The present work aimed to study the effects of temperature changes and concrete creep on I-shaped steel–concrete composite continuous girder bridges during construction and operation processes. This study combined structural health monitoring data, an ANSYS finite element simulation, and the age-adjusted effective modulus method to obtain the variation laws of temperature and internal force in composite girders. Moreover, a temperature gradient model was proposed that is suitable for bridges in Hebei, China. In addition, a concrete creep experiment under unidirectional axial compression was performed using concrete specimens prepared from the concrete batch used to create the composite girder. The long-term evolution laws of the deflection and internal force of the composite girder were obtained by predicting the concrete creep effect. The measured data showed that the temperature variation trends of the steel beam and concrete slab were characterized by a sinusoidal curve without a temperature lag. The heating rate of the concrete slab was higher than the cooling rate. The prediction results showed that the internal force changes in the composite girder were characterized by three stages. The stress changes in the composite girder during the first 10 days were significant and the stress charge rate of the concrete slab, the steel girder and the shear stud can reach 5%–28%. The stress change rate decreased continuously during 10–90 days. The stress changed slowly and smoothly after 90 days. This research can provide feedback and reference for structural health monitoring and service safety control of similar I-shaped steel–concrete composite bridges.
format Online
Article
Text
id pubmed-7254365
institution National Center for Biotechnology Information
language English
publishDate 2020
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-72543652020-06-10 Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods Wang, Guang-Ming Zhu, Li Zhou, Guang-Pan Han, Bing Ji, Wen-Yu Materials (Basel) Article The present work aimed to study the effects of temperature changes and concrete creep on I-shaped steel–concrete composite continuous girder bridges during construction and operation processes. This study combined structural health monitoring data, an ANSYS finite element simulation, and the age-adjusted effective modulus method to obtain the variation laws of temperature and internal force in composite girders. Moreover, a temperature gradient model was proposed that is suitable for bridges in Hebei, China. In addition, a concrete creep experiment under unidirectional axial compression was performed using concrete specimens prepared from the concrete batch used to create the composite girder. The long-term evolution laws of the deflection and internal force of the composite girder were obtained by predicting the concrete creep effect. The measured data showed that the temperature variation trends of the steel beam and concrete slab were characterized by a sinusoidal curve without a temperature lag. The heating rate of the concrete slab was higher than the cooling rate. The prediction results showed that the internal force changes in the composite girder were characterized by three stages. The stress changes in the composite girder during the first 10 days were significant and the stress charge rate of the concrete slab, the steel girder and the shear stud can reach 5%–28%. The stress change rate decreased continuously during 10–90 days. The stress changed slowly and smoothly after 90 days. This research can provide feedback and reference for structural health monitoring and service safety control of similar I-shaped steel–concrete composite bridges. MDPI 2020-05-03 /pmc/articles/PMC7254365/ /pubmed/32375242 http://dx.doi.org/10.3390/ma13092123 Text en © 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Wang, Guang-Ming
Zhu, Li
Zhou, Guang-Pan
Han, Bing
Ji, Wen-Yu
Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods
title Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods
title_full Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods
title_fullStr Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods
title_full_unstemmed Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods
title_short Experimental Research of the Time-Dependent Effects of Steel–Concrete Composite Girder Bridges during Construction and Operation Periods
title_sort experimental research of the time-dependent effects of steel–concrete composite girder bridges during construction and operation periods
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7254365/
https://www.ncbi.nlm.nih.gov/pubmed/32375242
http://dx.doi.org/10.3390/ma13092123
work_keys_str_mv AT wangguangming experimentalresearchofthetimedependenteffectsofsteelconcretecompositegirderbridgesduringconstructionandoperationperiods
AT zhuli experimentalresearchofthetimedependenteffectsofsteelconcretecompositegirderbridgesduringconstructionandoperationperiods
AT zhouguangpan experimentalresearchofthetimedependenteffectsofsteelconcretecompositegirderbridgesduringconstructionandoperationperiods
AT hanbing experimentalresearchofthetimedependenteffectsofsteelconcretecompositegirderbridgesduringconstructionandoperationperiods
AT jiwenyu experimentalresearchofthetimedependenteffectsofsteelconcretecompositegirderbridgesduringconstructionandoperationperiods