Cargando…
The importance of long-term well management in geothermal power systems using fuzzy control: A Western Anatolia (Turkey) case study
Effective geothermal power generation depends on two main elements: geothermal reservoir management and maintenance of the power plant. Reservoir management consists of both the fluid production and reinjection of brine to the underground. The management of wells is important to ensure the sustainab...
Autor principal: | |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier Ltd.
2020
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7490243/ https://www.ncbi.nlm.nih.gov/pubmed/32952272 http://dx.doi.org/10.1016/j.energy.2020.118817 |