Cargando…
Modeling the Capacitated Multi-Level Lot-Sizing Problem under Time-Varying Environments and a Fix-and-Optimize Solution Approach
In this study, we investigated the time-varying capacitated lot-sizing problem under a fast-changing production environment, where production factors such as the setup costs, inventory-holding costs, production capacities, or even material prices may be subject to continuous changes during the entir...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2019
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7514860/ https://www.ncbi.nlm.nih.gov/pubmed/33267091 http://dx.doi.org/10.3390/e21040377 |