Cargando…

Retrofit of two way holding chuck to improve process efficiency and resource management

In today’s industrial scenarios, having continuous improvement to increase the process efficiency is one of the key measures. Especially manufacturing and automotive industries are putting forth a lot of resource and time to improve the efficiency of the process without compromising the current prod...

Descripción completa

Detalles Bibliográficos
Autores principales: Nishal, M., Ram Prasad, K., Karthik Balaji, T.V., Kalaivanan, K.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier Ltd. 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7523530/
https://www.ncbi.nlm.nih.gov/pubmed/33014714
http://dx.doi.org/10.1016/j.matpr.2020.08.024
_version_ 1783588396912869376
author Nishal, M.
Ram Prasad, K.
Karthik Balaji, T.V.
Kalaivanan, K.
author_facet Nishal, M.
Ram Prasad, K.
Karthik Balaji, T.V.
Kalaivanan, K.
author_sort Nishal, M.
collection PubMed
description In today’s industrial scenarios, having continuous improvement to increase the process efficiency is one of the key measures. Especially manufacturing and automotive industries are putting forth a lot of resource and time to improve the efficiency of the process without compromising the current production capacity and improve the quality rate. This paper deals with a case study of retrofitting a two-way chuck in a vertical lathe machine and thereby calculating the overall equipment effectiveness of the entire automated process in piston manufacturing. The current automated production line of piston manufacturing is being analysed with the help of value stream mapping (VSM). Value stream mapping is widely used by the industrial persons to identify the wastes i.e., non-value-added time in the process line. The Critical to Quality (CTQ) parameters in an efficient production line such as lead time, value added time, transfer time and takt time have taken into account for identifying the places of improvement. A new retrofitted design has been suggested which can increase the production efficiency of the current system with effective utilization of available resources. After implementing the modified retrofit design, the subsequent changes in the process line have also been stated through Future state VSM, which clearly indicates the reduction in drop to drop time between the cells which has been considered as the non value added time in the current system. Studies like these shows that effective utilisation of available resources through retrofitting can greatly assist the manufacturers to reduce their cost of additional investment and be sustainable among the growing competitors in the market.
format Online
Article
Text
id pubmed-7523530
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Elsevier Ltd.
record_format MEDLINE/PubMed
spelling pubmed-75235302020-09-30 Retrofit of two way holding chuck to improve process efficiency and resource management Nishal, M. Ram Prasad, K. Karthik Balaji, T.V. Kalaivanan, K. Mater Today Proc Article In today’s industrial scenarios, having continuous improvement to increase the process efficiency is one of the key measures. Especially manufacturing and automotive industries are putting forth a lot of resource and time to improve the efficiency of the process without compromising the current production capacity and improve the quality rate. This paper deals with a case study of retrofitting a two-way chuck in a vertical lathe machine and thereby calculating the overall equipment effectiveness of the entire automated process in piston manufacturing. The current automated production line of piston manufacturing is being analysed with the help of value stream mapping (VSM). Value stream mapping is widely used by the industrial persons to identify the wastes i.e., non-value-added time in the process line. The Critical to Quality (CTQ) parameters in an efficient production line such as lead time, value added time, transfer time and takt time have taken into account for identifying the places of improvement. A new retrofitted design has been suggested which can increase the production efficiency of the current system with effective utilization of available resources. After implementing the modified retrofit design, the subsequent changes in the process line have also been stated through Future state VSM, which clearly indicates the reduction in drop to drop time between the cells which has been considered as the non value added time in the current system. Studies like these shows that effective utilisation of available resources through retrofitting can greatly assist the manufacturers to reduce their cost of additional investment and be sustainable among the growing competitors in the market. Elsevier Ltd. 2021 2020-09-29 /pmc/articles/PMC7523530/ /pubmed/33014714 http://dx.doi.org/10.1016/j.matpr.2020.08.024 Text en © 2020 Elsevier Ltd. All rights reserved. Selection and Peer-review under responsibility of the scientific committee of the International Mechanical Engineering Congress 2019: Materials Science. Since January 2020 Elsevier has created a COVID-19 resource centre with free information in English and Mandarin on the novel coronavirus COVID-19. The COVID-19 resource centre is hosted on Elsevier Connect, the company's public news and information website. Elsevier hereby grants permission to make all its COVID-19-related research that is available on the COVID-19 resource centre - including this research content - immediately available in PubMed Central and other publicly funded repositories, such as the WHO COVID database with rights for unrestricted research re-use and analyses in any form or by any means with acknowledgement of the original source. These permissions are granted for free by Elsevier for as long as the COVID-19 resource centre remains active.
spellingShingle Article
Nishal, M.
Ram Prasad, K.
Karthik Balaji, T.V.
Kalaivanan, K.
Retrofit of two way holding chuck to improve process efficiency and resource management
title Retrofit of two way holding chuck to improve process efficiency and resource management
title_full Retrofit of two way holding chuck to improve process efficiency and resource management
title_fullStr Retrofit of two way holding chuck to improve process efficiency and resource management
title_full_unstemmed Retrofit of two way holding chuck to improve process efficiency and resource management
title_short Retrofit of two way holding chuck to improve process efficiency and resource management
title_sort retrofit of two way holding chuck to improve process efficiency and resource management
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7523530/
https://www.ncbi.nlm.nih.gov/pubmed/33014714
http://dx.doi.org/10.1016/j.matpr.2020.08.024
work_keys_str_mv AT nishalm retrofitoftwowayholdingchucktoimproveprocessefficiencyandresourcemanagement
AT ramprasadk retrofitoftwowayholdingchucktoimproveprocessefficiencyandresourcemanagement
AT karthikbalajitv retrofitoftwowayholdingchucktoimproveprocessefficiencyandresourcemanagement
AT kalaivanank retrofitoftwowayholdingchucktoimproveprocessefficiencyandresourcemanagement