Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis

Modular integrated construction (MiC) is a revolutionary construction method. However, the logistics management of MiC has always been a major barrier to the wider adoption of MiC. Nonetheless, this challenge can be tackled by the application of lean techniques, namely, just-in-time (JIT). Numerous...

Descripción completa

Detalles Bibliográficos
Autores principales: Hussein, Mohamed, Zayed, Tarek
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier Ltd. 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7571479/
https://www.ncbi.nlm.nih.gov/pubmed/33100602
http://dx.doi.org/10.1016/j.jclepro.2020.124716
_version_ 1783597179175174144
author Hussein, Mohamed
Zayed, Tarek
author_facet Hussein, Mohamed
Zayed, Tarek
author_sort Hussein, Mohamed
collection PubMed
description Modular integrated construction (MiC) is a revolutionary construction method. However, the logistics management of MiC has always been a major barrier to the wider adoption of MiC. Nonetheless, this challenge can be tackled by the application of lean techniques, namely, just-in-time (JIT). Numerous studies have identified and evaluated the critical factors (CFs) required to implement JIT; however, there is no consensus among the previous studies on these CFs and their level of importance. Therefore, this research, for the first time, provides a systematic review and meta-analysis of these CFs. The systematic review identifies 42 CFs. To further provide a synthesis analysis of previous studies, a meta-analysis approach is used. This analysis is conducted on the identified CFs to evaluate their importance level and hence rank them. The results indicate that all the 42 CFs are important for applying JIT, of which seven are highly significant for successfully implementing JIT in MiC. Although the ranking obtained by meta-analysis is much more reliable than that provided in the individual studies, however, there is still a high heterogeneity in the results, which depicts the uncertain nature of the construction field. Therefore, sub-group analysis is conducted to investigate this heterogeneity and uncover the hidden patterns in the literature. This is achieved by studying the influence of predictive factors (moderators) on the importance level of CFs. This analysis shows that the economy of a country and the type of project executed are influential factors. The results further indicate that developing economies, in contrast to advanced economies, should pay more attention to three CFs. Also, the results show that seven CFs are much more important in MiC projects than the other project types. This research work is highly beneficial for theory development and for practitioners by identification of significant CFs that warrant management dedication to best apply JIT. Researchers, in particular, can consider the recommendations given here for implementing future meta-analysis studies.
format Online
Article
Text
id pubmed-7571479
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Elsevier Ltd.
record_format MEDLINE/PubMed
spelling pubmed-75714792020-10-20 Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis Hussein, Mohamed Zayed, Tarek J Clean Prod Review Modular integrated construction (MiC) is a revolutionary construction method. However, the logistics management of MiC has always been a major barrier to the wider adoption of MiC. Nonetheless, this challenge can be tackled by the application of lean techniques, namely, just-in-time (JIT). Numerous studies have identified and evaluated the critical factors (CFs) required to implement JIT; however, there is no consensus among the previous studies on these CFs and their level of importance. Therefore, this research, for the first time, provides a systematic review and meta-analysis of these CFs. The systematic review identifies 42 CFs. To further provide a synthesis analysis of previous studies, a meta-analysis approach is used. This analysis is conducted on the identified CFs to evaluate their importance level and hence rank them. The results indicate that all the 42 CFs are important for applying JIT, of which seven are highly significant for successfully implementing JIT in MiC. Although the ranking obtained by meta-analysis is much more reliable than that provided in the individual studies, however, there is still a high heterogeneity in the results, which depicts the uncertain nature of the construction field. Therefore, sub-group analysis is conducted to investigate this heterogeneity and uncover the hidden patterns in the literature. This is achieved by studying the influence of predictive factors (moderators) on the importance level of CFs. This analysis shows that the economy of a country and the type of project executed are influential factors. The results further indicate that developing economies, in contrast to advanced economies, should pay more attention to three CFs. Also, the results show that seven CFs are much more important in MiC projects than the other project types. This research work is highly beneficial for theory development and for practitioners by identification of significant CFs that warrant management dedication to best apply JIT. Researchers, in particular, can consider the recommendations given here for implementing future meta-analysis studies. Elsevier Ltd. 2021-02-15 2020-10-19 /pmc/articles/PMC7571479/ /pubmed/33100602 http://dx.doi.org/10.1016/j.jclepro.2020.124716 Text en © 2020 Elsevier Ltd. All rights reserved. Since January 2020 Elsevier has created a COVID-19 resource centre with free information in English and Mandarin on the novel coronavirus COVID-19. The COVID-19 resource centre is hosted on Elsevier Connect, the company's public news and information website. Elsevier hereby grants permission to make all its COVID-19-related research that is available on the COVID-19 resource centre - including this research content - immediately available in PubMed Central and other publicly funded repositories, such as the WHO COVID database with rights for unrestricted research re-use and analyses in any form or by any means with acknowledgement of the original source. These permissions are granted for free by Elsevier for as long as the COVID-19 resource centre remains active.
spellingShingle Review
Hussein, Mohamed
Zayed, Tarek
Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
title Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
title_full Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
title_fullStr Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
title_full_unstemmed Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
title_short Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis
title_sort critical factors for successful implementation of just-in-time concept in modular integrated construction: a systematic review and meta-analysis
topic Review
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7571479/
https://www.ncbi.nlm.nih.gov/pubmed/33100602
http://dx.doi.org/10.1016/j.jclepro.2020.124716
work_keys_str_mv AT husseinmohamed criticalfactorsforsuccessfulimplementationofjustintimeconceptinmodularintegratedconstructionasystematicreviewandmetaanalysis
AT zayedtarek criticalfactorsforsuccessfulimplementationofjustintimeconceptinmodularintegratedconstructionasystematicreviewandmetaanalysis