Cargando…
Establishing a 130-Bed Field Intensive Care Unit to Prepare for COVID-19 in 7 Days in Bahrain Military Hospital
This article reports the establishment of an isolated, fully functional field intensive care unit (FICU) unit equipped with all necessary critical care facilities as a part of the national pre-emptive preparedness to treat an unexpected surge outbreak of coronavirus disease 2019 (COVID-19) patients...
Autores principales: | , , , , , , , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Cambridge University Press
2020
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7590572/ https://www.ncbi.nlm.nih.gov/pubmed/32782041 http://dx.doi.org/10.1017/dmp.2020.297 |
Sumario: | This article reports the establishment of an isolated, fully functional field intensive care unit (FICU) unit equipped with all necessary critical care facilities as a part of the national pre-emptive preparedness to treat an unexpected surge outbreak of coronavirus disease 2019 (COVID-19) patients in Bahrain. One floor of an existing car parking structure was converted into a 130-bed FICU set-up by the in-house project implementation team comprised of multidisciplinary departments. The setting was a military hospital in the Kingdom of Bahrain, and the car park was on the hospital premises. The FICU contained a 112-bed fully equipped ICU and an 18-bed step-down ICU, and was built in 7 d to cater to the intensive care of COVID-19 patients in Bahrain. |
---|