Flexible Sensor Array Based on Transient Earth Voltage for Online Partial Discharge Monitoring of Cable Termination
Cable termination is a weak point in an underground cable system. The transient earth voltage (TEV) method is an effective and nonintrusive method for estimating the insulation condition of cable termination. However, the practical application of TEV detection is mainly focused on switchgears, gener...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2020
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7699696/ https://www.ncbi.nlm.nih.gov/pubmed/33233567 http://dx.doi.org/10.3390/s20226646 |
Sumario: | Cable termination is a weak point in an underground cable system. The transient earth voltage (TEV) method is an effective and nonintrusive method for estimating the insulation condition of cable termination. However, the practical application of TEV detection is mainly focused on switchgears, generators, and transformers with a flat and conductive shell. A flexible sensor array based on the TEV method is presented for online partial discharge (OLPD) monitoring of the cable termination. Each sensing element is designed with a dual-capacitor structure made of flexible polymer material to obtain better and more stable sensitivity. Based on the electromagnetic (EM) wave propagation theory, the partial discharge (PD) propagation model in the cable termination is built to analyze and verify the rationality and validity of the sensor unit. Some influencing factors are discussed regarding the response characteristics of sensors. Finally, the performance of the sensor array is verified by simulations and experiments. Besides, an OLPD monitoring system is introduced. The monitoring system is composed of the on-site monitoring device and the remote monitoring host. The two parts of the system exchange the data through wireless networks using a wireless communication module. The experiment results show that the monitoring device could supply the PD condition monitoring demand for cable termination. |
---|