Cargando…
An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China
Mega infrastructure projects provide a basic guarantee for social development, economic construction, and livelihood improvement. Their operation and maintenance (O&M) management are of great significance for the smooth operation and the realization of the value created by the projects. In order...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2020
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7767428/ https://www.ncbi.nlm.nih.gov/pubmed/33371434 http://dx.doi.org/10.3390/ijerph17249589 |
_version_ | 1783628956280291328 |
---|---|
author | Chen, Dan Xiang, Pengcheng Jia, Fuyuan Zhang, Jian Liu, Zhaowen |
author_facet | Chen, Dan Xiang, Pengcheng Jia, Fuyuan Zhang, Jian Liu, Zhaowen |
author_sort | Chen, Dan |
collection | PubMed |
description | Mega infrastructure projects provide a basic guarantee for social development, economic construction, and livelihood improvement. Their operation and maintenance (O&M) management are of great significance for the smooth operation and the realization of the value created by the projects. In order to provide an approach for effectively evaluating O&M management, this study develops a holistic indicator system using a mixed-review method from the national macro perspective in China. In this study, literature analysis, policy texts, expert interviews, and grounded theory were used to collect relevant data at home and abroad, and establish an initial evaluation indicator system with 23 indicators covering two dimensions and five aspects. Then the questionnaire survey and factor analysis were used to score and categorize the indicators, and finally an evaluation indicator system for O&M management of mega infrastructure projects was formed. The results show that social relations, environmental benefits, macro policy, and operational capacities play an important role in the evaluation of the O&M of mega infrastructure projects. This study helps the management team to avoid negative impacts in the O&M management of mega infrastructure projects and lays a theoretical foundation for future research. The indicator system in this study is based on the Chinese context, and it remains to be verified whether the indicator system is applicable to other countries due to the differences in political and cultural backgrounds in different regions. |
format | Online Article Text |
id | pubmed-7767428 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2020 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-77674282020-12-28 An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China Chen, Dan Xiang, Pengcheng Jia, Fuyuan Zhang, Jian Liu, Zhaowen Int J Environ Res Public Health Article Mega infrastructure projects provide a basic guarantee for social development, economic construction, and livelihood improvement. Their operation and maintenance (O&M) management are of great significance for the smooth operation and the realization of the value created by the projects. In order to provide an approach for effectively evaluating O&M management, this study develops a holistic indicator system using a mixed-review method from the national macro perspective in China. In this study, literature analysis, policy texts, expert interviews, and grounded theory were used to collect relevant data at home and abroad, and establish an initial evaluation indicator system with 23 indicators covering two dimensions and five aspects. Then the questionnaire survey and factor analysis were used to score and categorize the indicators, and finally an evaluation indicator system for O&M management of mega infrastructure projects was formed. The results show that social relations, environmental benefits, macro policy, and operational capacities play an important role in the evaluation of the O&M of mega infrastructure projects. This study helps the management team to avoid negative impacts in the O&M management of mega infrastructure projects and lays a theoretical foundation for future research. The indicator system in this study is based on the Chinese context, and it remains to be verified whether the indicator system is applicable to other countries due to the differences in political and cultural backgrounds in different regions. MDPI 2020-12-21 2020-12 /pmc/articles/PMC7767428/ /pubmed/33371434 http://dx.doi.org/10.3390/ijerph17249589 Text en © 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Chen, Dan Xiang, Pengcheng Jia, Fuyuan Zhang, Jian Liu, Zhaowen An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China |
title | An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China |
title_full | An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China |
title_fullStr | An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China |
title_full_unstemmed | An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China |
title_short | An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China |
title_sort | indicator system for evaluating operation and maintenance management of mega infrastructure projects in china |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7767428/ https://www.ncbi.nlm.nih.gov/pubmed/33371434 http://dx.doi.org/10.3390/ijerph17249589 |
work_keys_str_mv | AT chendan anindicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT xiangpengcheng anindicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT jiafuyuan anindicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT zhangjian anindicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT liuzhaowen anindicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT chendan indicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT xiangpengcheng indicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT jiafuyuan indicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT zhangjian indicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina AT liuzhaowen indicatorsystemforevaluatingoperationandmaintenancemanagementofmegainfrastructureprojectsinchina |