Cargando…

Verification-phase tests show low reliability and add little value in determining [Image: see text] O(2)max in young trained adults

OBJECTIVE: This study compared the robustness of a [Image: see text] -plateau definition and a verification-phase protocol to day-to-day and diurnal variations in determining the true [Image: see text] . Further, the additional value of a verification-phase was investigated. METHODS: Eighteen adults...

Descripción completa

Detalles Bibliográficos
Autores principales: Wagner, Jonathan, Niemeyer, Max, Infanger, Denis, Hinrichs, Timo, Guerra, Clement, Klenk, Christopher, Königstein, Karsten, Cajochen, Christian, Schmidt-Trucksäss, Arno, Knaier, Raphael
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7799856/
https://www.ncbi.nlm.nih.gov/pubmed/33428687
http://dx.doi.org/10.1371/journal.pone.0245306
Descripción
Sumario:OBJECTIVE: This study compared the robustness of a [Image: see text] -plateau definition and a verification-phase protocol to day-to-day and diurnal variations in determining the true [Image: see text] . Further, the additional value of a verification-phase was investigated. METHODS: Eighteen adults performed six cardiorespiratory fitness tests at six different times of the day (diurnal variation) as well as a seventh test at the same time the sixth test took place (day-to-day variation). A verification-phase was performed immediately after each test, with a stepwise increase in intensity to 50%, 70%, and 105% of the peak power output. RESULTS: Participants mean [Image: see text] was 56 ± 8 mL/kg/min. Gwet’s AC(1) values (95% confidence intervals) for the day-to-day and diurnal variations were 0.64 (0.22, 1.00) and 0.71 (0.42, 0.99) for [Image: see text] -plateau and for the verification-phase 0.69 (0.31, 1.00) and 0.07 (−0.38, 0.52), respectively. In 66% of the tests, performing the verification-phase added no value, while, in 32% and 2%, it added uncertain value and certain value, respectively, in the determination of [Image: see text] . CONCLUSION: Compared to [Image: see text] -plateau the verification-phase shows lower reliability, increases costs and only adds certain value in 2% of cases.