Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A., Ferreira, D., Morabito, R., Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7875836/ https://www.ncbi.nlm.nih.gov/pubmed/33604429 http://dx.doi.org/10.1016/j.dib.2021.106810 |
_version_ | 1783649846330130432 |
---|---|
author | Piñeros, Juan Toscano, Alyne Ferreira, Deisemara Morabito, Reinaldo |
author_facet | Piñeros, Juan Toscano, Alyne Ferreira, Deisemara Morabito, Reinaldo |
author_sort | Piñeros, Juan |
collection | PubMed |
description | The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A., Ferreira, D., Morabito, R., Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning” (Toscano, A., Ferreira, D., Morabito, R., Flexible Services and Manufacturing Journal) [2], and in “A heuristic approach to optimize the production scheduling of fruit-based beverages” (Toscano et al., Gestão & Produção, 2020) [3]. In fruit-based production processes, there are two production stages: preparation tanks and production lines. This production process has some process-specific characteristics, such as temporal cleanings and synchrony between the two production stages, which make optimized production planning and scheduling even more difficult. Thus, some papers in the literature have proposed different methods to solve this problem. To the best of our knowledge, there are no standard datasets used by researchers in the literature to verify the accuracy and performance of proposed methods or to be a benchmark for other researchers considering this problem. The authors have been using small data sets that do not satisfactorily represent different scenarios of production. Since the demand in the beverage sector is seasonal, a wide range of scenarios enables us to evaluate the effectiveness of the proposed methods in the scientific literature in solving real scenarios of the problem. The datasets presented here include data based on real data collected from five beverage companies. We presented four datasets that are specifically constructed assuming a scenario of restricted capacity and balanced costs. |
format | Online Article Text |
id | pubmed-7875836 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2021 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-78758362021-02-17 Datasets for lot sizing and scheduling problems in the fruit-based beverage production process Piñeros, Juan Toscano, Alyne Ferreira, Deisemara Morabito, Reinaldo Data Brief Data Article The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A., Ferreira, D., Morabito, R., Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning” (Toscano, A., Ferreira, D., Morabito, R., Flexible Services and Manufacturing Journal) [2], and in “A heuristic approach to optimize the production scheduling of fruit-based beverages” (Toscano et al., Gestão & Produção, 2020) [3]. In fruit-based production processes, there are two production stages: preparation tanks and production lines. This production process has some process-specific characteristics, such as temporal cleanings and synchrony between the two production stages, which make optimized production planning and scheduling even more difficult. Thus, some papers in the literature have proposed different methods to solve this problem. To the best of our knowledge, there are no standard datasets used by researchers in the literature to verify the accuracy and performance of proposed methods or to be a benchmark for other researchers considering this problem. The authors have been using small data sets that do not satisfactorily represent different scenarios of production. Since the demand in the beverage sector is seasonal, a wide range of scenarios enables us to evaluate the effectiveness of the proposed methods in the scientific literature in solving real scenarios of the problem. The datasets presented here include data based on real data collected from five beverage companies. We presented four datasets that are specifically constructed assuming a scenario of restricted capacity and balanced costs. Elsevier 2021-01-29 /pmc/articles/PMC7875836/ /pubmed/33604429 http://dx.doi.org/10.1016/j.dib.2021.106810 Text en © 2021 The Authors http://creativecommons.org/licenses/by/4.0/ This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Data Article Piñeros, Juan Toscano, Alyne Ferreira, Deisemara Morabito, Reinaldo Datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
title | Datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
title_full | Datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
title_fullStr | Datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
title_full_unstemmed | Datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
title_short | Datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
title_sort | datasets for lot sizing and scheduling problems in the fruit-based beverage production process |
topic | Data Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7875836/ https://www.ncbi.nlm.nih.gov/pubmed/33604429 http://dx.doi.org/10.1016/j.dib.2021.106810 |
work_keys_str_mv | AT pinerosjuan datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess AT toscanoalyne datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess AT ferreiradeisemara datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess AT morabitoreinaldo datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess |