Cargando…

Datasets for lot sizing and scheduling problems in the fruit-based beverage production process

The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A.,  Ferreira, D., Morabito, R., Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing...

Descripción completa

Detalles Bibliográficos
Autores principales: Piñeros, Juan, Toscano, Alyne, Ferreira, Deisemara, Morabito, Reinaldo
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7875836/
https://www.ncbi.nlm.nih.gov/pubmed/33604429
http://dx.doi.org/10.1016/j.dib.2021.106810
_version_ 1783649846330130432
author Piñeros, Juan
Toscano, Alyne
Ferreira, Deisemara
Morabito, Reinaldo
author_facet Piñeros, Juan
Toscano, Alyne
Ferreira, Deisemara
Morabito, Reinaldo
author_sort Piñeros, Juan
collection PubMed
description The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A.,  Ferreira, D., Morabito, R., Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning” (Toscano, A., Ferreira, D., Morabito, R., Flexible Services and Manufacturing Journal) [2], and in “A heuristic approach to optimize the production scheduling of fruit-based beverages” (Toscano et al., Gestão & Produção, 2020) [3]. In fruit-based production processes, there are two production stages: preparation tanks and production lines. This production process has some process-specific characteristics, such as temporal cleanings and synchrony between the two production stages, which make optimized production planning and scheduling even more difficult. Thus, some papers in the literature have proposed different methods to solve this problem. To the best of our knowledge, there are no standard datasets used by researchers in the literature to verify the accuracy and performance of proposed methods or to be a benchmark for other researchers considering this problem. The authors have been using small data sets that do not satisfactorily represent different scenarios of production. Since the demand in the beverage sector is seasonal, a wide range of scenarios enables us to evaluate the effectiveness of the proposed methods in the scientific literature in solving real scenarios of the problem. The datasets presented here include data based on real data collected from five beverage companies. We presented four datasets that are specifically constructed assuming a scenario of restricted capacity and balanced costs.
format Online
Article
Text
id pubmed-7875836
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-78758362021-02-17 Datasets for lot sizing and scheduling problems in the fruit-based beverage production process Piñeros, Juan Toscano, Alyne Ferreira, Deisemara Morabito, Reinaldo Data Brief Data Article The datasets presented here were partially used in “Formulation and MIP-heuristics for the lot sizing and scheduling problem with temporal cleanings” (Toscano, A.,  Ferreira, D., Morabito, R., Computers & Chemical Engineering) [1], in “A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning” (Toscano, A., Ferreira, D., Morabito, R., Flexible Services and Manufacturing Journal) [2], and in “A heuristic approach to optimize the production scheduling of fruit-based beverages” (Toscano et al., Gestão & Produção, 2020) [3]. In fruit-based production processes, there are two production stages: preparation tanks and production lines. This production process has some process-specific characteristics, such as temporal cleanings and synchrony between the two production stages, which make optimized production planning and scheduling even more difficult. Thus, some papers in the literature have proposed different methods to solve this problem. To the best of our knowledge, there are no standard datasets used by researchers in the literature to verify the accuracy and performance of proposed methods or to be a benchmark for other researchers considering this problem. The authors have been using small data sets that do not satisfactorily represent different scenarios of production. Since the demand in the beverage sector is seasonal, a wide range of scenarios enables us to evaluate the effectiveness of the proposed methods in the scientific literature in solving real scenarios of the problem. The datasets presented here include data based on real data collected from five beverage companies. We presented four datasets that are specifically constructed assuming a scenario of restricted capacity and balanced costs. Elsevier 2021-01-29 /pmc/articles/PMC7875836/ /pubmed/33604429 http://dx.doi.org/10.1016/j.dib.2021.106810 Text en © 2021 The Authors http://creativecommons.org/licenses/by/4.0/ This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Data Article
Piñeros, Juan
Toscano, Alyne
Ferreira, Deisemara
Morabito, Reinaldo
Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
title Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
title_full Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
title_fullStr Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
title_full_unstemmed Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
title_short Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
title_sort datasets for lot sizing and scheduling problems in the fruit-based beverage production process
topic Data Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7875836/
https://www.ncbi.nlm.nih.gov/pubmed/33604429
http://dx.doi.org/10.1016/j.dib.2021.106810
work_keys_str_mv AT pinerosjuan datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess
AT toscanoalyne datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess
AT ferreiradeisemara datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess
AT morabitoreinaldo datasetsforlotsizingandschedulingproblemsinthefruitbasedbeverageproductionprocess