Cargando…
Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading?
AIMS: The primary aim is to estimate the current and potential number of patients on NHS England orthopaedic elective waiting lists by November 2020. The secondary aims are to model recovery strategies; review the deficit of hip and knee arthroplasty from National Joint Registry (NJR) data; and asse...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
The British Editorial Society of Bone & Joint Surgery
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7925214/ https://www.ncbi.nlm.nih.gov/pubmed/33573397 http://dx.doi.org/10.1302/2633-1462.22.BJO-2020-0161.R1 |
_version_ | 1783659234865446912 |
---|---|
author | Oussedik, Sam MacIntyre, Sam Gray, Joanne McMeekin, Peter Clement, Nick D. Deehan, David J. |
author_facet | Oussedik, Sam MacIntyre, Sam Gray, Joanne McMeekin, Peter Clement, Nick D. Deehan, David J. |
author_sort | Oussedik, Sam |
collection | PubMed |
description | AIMS: The primary aim is to estimate the current and potential number of patients on NHS England orthopaedic elective waiting lists by November 2020. The secondary aims are to model recovery strategies; review the deficit of hip and knee arthroplasty from National Joint Registry (NJR) data; and assess the cost of returning to pre-COVID-19 waiting list numbers. METHODS: A model of referral, waiting list, and eventual surgery was created and calibrated using historical data from NHS England (April 2017 to March 2020) and was used to investigate the possible consequences of unmet demand resulting from fewer patients entering the treatment pathway and recovery strategies. NJR data were used to estimate the deficit of hip and knee arthroplasty by August 2020 and NHS tariff costs were used to calculate the financial burden. RESULTS: By November 2020, the elective waiting list in England is predicted to be between 885,286 and 1,028,733. If reduced hospital capacity is factored into the model, returning to full capacity by November, the waiting list could be as large as 1.4 million. With a 30% increase in productivity, it would take 20 months if there was no hidden burden of unreferred patients, and 48 months if there was a hidden burden, to return to pre-COVID-19 waiting list numbers. By August 2020, the estimated deficits of hip and knee arthroplasties from NJR data were 18,298 (44.8%) and 16,567 (38.6%), respectively, compared to the same time period in 2019. The cost to clear this black log would be £198,811,335. CONCLUSION: There will be up to 1.4 million patients on elective orthopaedic waiting lists in England by November 2020, approximate three-times the pre-COVID-19 average. There are various strategies for recovery to return to pre-COVID-19 waiting list numbers reliant on increasing capacity, but these have substantial cost implications. Cite this article: Bone Jt Open 2021;2(2):103–110. |
format | Online Article Text |
id | pubmed-7925214 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2021 |
publisher | The British Editorial Society of Bone & Joint Surgery |
record_format | MEDLINE/PubMed |
spelling | pubmed-79252142021-03-04 Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? Oussedik, Sam MacIntyre, Sam Gray, Joanne McMeekin, Peter Clement, Nick D. Deehan, David J. Bone Jt Open General Orthopaedics AIMS: The primary aim is to estimate the current and potential number of patients on NHS England orthopaedic elective waiting lists by November 2020. The secondary aims are to model recovery strategies; review the deficit of hip and knee arthroplasty from National Joint Registry (NJR) data; and assess the cost of returning to pre-COVID-19 waiting list numbers. METHODS: A model of referral, waiting list, and eventual surgery was created and calibrated using historical data from NHS England (April 2017 to March 2020) and was used to investigate the possible consequences of unmet demand resulting from fewer patients entering the treatment pathway and recovery strategies. NJR data were used to estimate the deficit of hip and knee arthroplasty by August 2020 and NHS tariff costs were used to calculate the financial burden. RESULTS: By November 2020, the elective waiting list in England is predicted to be between 885,286 and 1,028,733. If reduced hospital capacity is factored into the model, returning to full capacity by November, the waiting list could be as large as 1.4 million. With a 30% increase in productivity, it would take 20 months if there was no hidden burden of unreferred patients, and 48 months if there was a hidden burden, to return to pre-COVID-19 waiting list numbers. By August 2020, the estimated deficits of hip and knee arthroplasties from NJR data were 18,298 (44.8%) and 16,567 (38.6%), respectively, compared to the same time period in 2019. The cost to clear this black log would be £198,811,335. CONCLUSION: There will be up to 1.4 million patients on elective orthopaedic waiting lists in England by November 2020, approximate three-times the pre-COVID-19 average. There are various strategies for recovery to return to pre-COVID-19 waiting list numbers reliant on increasing capacity, but these have substantial cost implications. Cite this article: Bone Jt Open 2021;2(2):103–110. The British Editorial Society of Bone & Joint Surgery 2021-02-12 /pmc/articles/PMC7925214/ /pubmed/33573397 http://dx.doi.org/10.1302/2633-1462.22.BJO-2020-0161.R1 Text en © 2021 Author(s) et al. https://creativecommons.org/licenses/by-nc-nd/4.0/ This is an open-access article distributed under the terms of the Creative Commons Attribution Non-Commercial No Derivatives (CC BY-NC-ND 4.0) licence, which permits the copying and redistribution of the work only, and provided the original author and source are credited. See https://creativecommons.org/licenses/by-nc-nd/4.0/. |
spellingShingle | General Orthopaedics Oussedik, Sam MacIntyre, Sam Gray, Joanne McMeekin, Peter Clement, Nick D. Deehan, David J. Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? |
title | Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? |
title_full | Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? |
title_fullStr | Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? |
title_full_unstemmed | Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? |
title_short | Elective orthopaedic cancellations due to the COVID-19 pandemic: where are we now, and where are we heading? |
title_sort | elective orthopaedic cancellations due to the covid-19 pandemic: where are we now, and where are we heading? |
topic | General Orthopaedics |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7925214/ https://www.ncbi.nlm.nih.gov/pubmed/33573397 http://dx.doi.org/10.1302/2633-1462.22.BJO-2020-0161.R1 |
work_keys_str_mv | AT oussediksam electiveorthopaediccancellationsduetothecovid19pandemicwherearewenowandwhereareweheading AT macintyresam electiveorthopaediccancellationsduetothecovid19pandemicwherearewenowandwhereareweheading AT grayjoanne electiveorthopaediccancellationsduetothecovid19pandemicwherearewenowandwhereareweheading AT mcmeekinpeter electiveorthopaediccancellationsduetothecovid19pandemicwherearewenowandwhereareweheading AT clementnickd electiveorthopaediccancellationsduetothecovid19pandemicwherearewenowandwhereareweheading AT deehandavidj electiveorthopaediccancellationsduetothecovid19pandemicwherearewenowandwhereareweheading |