Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia
Time, money, and quality are the three basic criteria for measuring construction project efficiency. The Ethiopian construction sector in general and public work projects, in particular, are believed to suffer from inefficiencies despite their quantitative growth in recent years. Previous researches...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7973297/ https://www.ncbi.nlm.nih.gov/pubmed/33763614 http://dx.doi.org/10.1016/j.heliyon.2021.e06462 |
_version_ | 1783666819087728640 |
---|---|
author | Kebede, Sintayehu D. Tiewei, Zhang |
author_facet | Kebede, Sintayehu D. Tiewei, Zhang |
author_sort | Kebede, Sintayehu D. |
collection | PubMed |
description | Time, money, and quality are the three basic criteria for measuring construction project efficiency. The Ethiopian construction sector in general and public work projects, in particular, are believed to suffer from inefficiencies despite their quantitative growth in recent years. Previous researches have made attempts to explore factors determining the efficiency of the sector such as the low capacity of contractors (both financial and equipment, shortage of skilled human resource on technical, managerial, and entrepreneurial skills, etc…), the poor performances of the supply chain, inflation in the economy and so on. However, process and system-based challenges of the sector resulting from the existing legal frameworks governing the sector such as the modes of delivery of projects (modes of contracting) have not been a subject of extensive study. In this study, doctrinal and non-doctrinal legal research methods are employed to explore project delivery system(s) recognized in Ethiopia's public work contract laws and appraise their efficiency in terms of ensuring prompt completion of public construction projects. The doctrinal aspect of the research exposed that, despite an implied recognition of Design-Build (DB) and its variant forms of project delivery system, the country's public work contract laws set up Design-Bid-Build (DBB) as a default mode of contracting. Besides, the result from a survey questionnaire of 158 respondents which was computed by using Research Package for Social Sciences (SPSS) to generate the Relative Importance Index (RII) of each mode of contracting corroborated by primary data derived from the completion and status report of 40 road and 9 building projects, shows that even though construction project time overrun (delay) often happens in both routes of contracting, the magnitude of such inefficiency is greater in public projects of DBB than DB delivery mode. |
format | Online Article Text |
id | pubmed-7973297 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2021 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-79732972021-03-23 Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia Kebede, Sintayehu D. Tiewei, Zhang Heliyon Research Article Time, money, and quality are the three basic criteria for measuring construction project efficiency. The Ethiopian construction sector in general and public work projects, in particular, are believed to suffer from inefficiencies despite their quantitative growth in recent years. Previous researches have made attempts to explore factors determining the efficiency of the sector such as the low capacity of contractors (both financial and equipment, shortage of skilled human resource on technical, managerial, and entrepreneurial skills, etc…), the poor performances of the supply chain, inflation in the economy and so on. However, process and system-based challenges of the sector resulting from the existing legal frameworks governing the sector such as the modes of delivery of projects (modes of contracting) have not been a subject of extensive study. In this study, doctrinal and non-doctrinal legal research methods are employed to explore project delivery system(s) recognized in Ethiopia's public work contract laws and appraise their efficiency in terms of ensuring prompt completion of public construction projects. The doctrinal aspect of the research exposed that, despite an implied recognition of Design-Build (DB) and its variant forms of project delivery system, the country's public work contract laws set up Design-Bid-Build (DBB) as a default mode of contracting. Besides, the result from a survey questionnaire of 158 respondents which was computed by using Research Package for Social Sciences (SPSS) to generate the Relative Importance Index (RII) of each mode of contracting corroborated by primary data derived from the completion and status report of 40 road and 9 building projects, shows that even though construction project time overrun (delay) often happens in both routes of contracting, the magnitude of such inefficiency is greater in public projects of DBB than DB delivery mode. Elsevier 2021-03-14 /pmc/articles/PMC7973297/ /pubmed/33763614 http://dx.doi.org/10.1016/j.heliyon.2021.e06462 Text en © 2021 The Author(s) http://creativecommons.org/licenses/by-nc-nd/4.0/ This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). |
spellingShingle | Research Article Kebede, Sintayehu D. Tiewei, Zhang Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia |
title | Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia |
title_full | Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia |
title_fullStr | Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia |
title_full_unstemmed | Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia |
title_short | Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia |
title_sort | public work contract laws on project delivery systems and their nexus with project efficiency: evidence from ethiopia |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC7973297/ https://www.ncbi.nlm.nih.gov/pubmed/33763614 http://dx.doi.org/10.1016/j.heliyon.2021.e06462 |
work_keys_str_mv | AT kebedesintayehud publicworkcontractlawsonprojectdeliverysystemsandtheirnexuswithprojectefficiencyevidencefromethiopia AT tieweizhang publicworkcontractlawsonprojectdeliverysystemsandtheirnexuswithprojectefficiencyevidencefromethiopia |