Cargando…

Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase

Healthcare organizations strive to deliver safe, high-quality, efficient care. These complex systems frequently harbor gaps, which if unmitigated, could result in harm. Systems-focused simulation (SFS) projects, which include systems-focused debriefing (SFD), if well designed and executed, can proac...

Descripción completa

Detalles Bibliográficos
Autores principales: Dubé, Mirette, Posner, Glenn, Stone, Kimberly, White, Marjorie, Kaba, Alyshah, Bajaj, Komal, Cheng, Adam, Grant, Vincent, Huang, Simon, Reid, Jennifer
Formato: Online Artículo Texto
Lenguaje:English
Publicado: BioMed Central 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8082890/
https://www.ncbi.nlm.nih.gov/pubmed/33926582
http://dx.doi.org/10.1186/s41077-021-00169-x
_version_ 1783685924020813824
author Dubé, Mirette
Posner, Glenn
Stone, Kimberly
White, Marjorie
Kaba, Alyshah
Bajaj, Komal
Cheng, Adam
Grant, Vincent
Huang, Simon
Reid, Jennifer
author_facet Dubé, Mirette
Posner, Glenn
Stone, Kimberly
White, Marjorie
Kaba, Alyshah
Bajaj, Komal
Cheng, Adam
Grant, Vincent
Huang, Simon
Reid, Jennifer
author_sort Dubé, Mirette
collection PubMed
description Healthcare organizations strive to deliver safe, high-quality, efficient care. These complex systems frequently harbor gaps, which if unmitigated, could result in harm. Systems-focused simulation (SFS) projects, which include systems-focused debriefing (SFD), if well designed and executed, can proactively and comprehensively identify gaps and test and improve systems, enabling institutions to improve safety and quality before patients and staff are placed at risk. The previously published systems-focused debriefing framework, Promoting Excellence and Reflective Learning in Simulation (PEARLS) for Systems Integration (PSI), describes a systematic approach to SFD. It includes an essential “pre-work” phase, encompassing evidence-informed steps that lead up to a SFD. Despite inclusion in the PSI framework, a detailed description of the pre-work phase, and how each component facilitates change management, was limited. The goal of this paper is to elucidate the PSI “Pre-work” phase, everything leading up to the systems-focused simulation and debriefing. It describes how the integration of project and change management principles ensures that a comprehensive collection of safety and quality issues are reliably identified and captured.
format Online
Article
Text
id pubmed-8082890
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher BioMed Central
record_format MEDLINE/PubMed
spelling pubmed-80828902021-04-29 Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase Dubé, Mirette Posner, Glenn Stone, Kimberly White, Marjorie Kaba, Alyshah Bajaj, Komal Cheng, Adam Grant, Vincent Huang, Simon Reid, Jennifer Adv Simul (Lond) Innovation Healthcare organizations strive to deliver safe, high-quality, efficient care. These complex systems frequently harbor gaps, which if unmitigated, could result in harm. Systems-focused simulation (SFS) projects, which include systems-focused debriefing (SFD), if well designed and executed, can proactively and comprehensively identify gaps and test and improve systems, enabling institutions to improve safety and quality before patients and staff are placed at risk. The previously published systems-focused debriefing framework, Promoting Excellence and Reflective Learning in Simulation (PEARLS) for Systems Integration (PSI), describes a systematic approach to SFD. It includes an essential “pre-work” phase, encompassing evidence-informed steps that lead up to a SFD. Despite inclusion in the PSI framework, a detailed description of the pre-work phase, and how each component facilitates change management, was limited. The goal of this paper is to elucidate the PSI “Pre-work” phase, everything leading up to the systems-focused simulation and debriefing. It describes how the integration of project and change management principles ensures that a comprehensive collection of safety and quality issues are reliably identified and captured. BioMed Central 2021-04-29 /pmc/articles/PMC8082890/ /pubmed/33926582 http://dx.doi.org/10.1186/s41077-021-00169-x Text en © The Author(s) 2021 https://creativecommons.org/licenses/by/4.0/Open AccessThis article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . The Creative Commons Public Domain Dedication waiver (http://creativecommons.org/publicdomain/zero/1.0/ (https://creativecommons.org/publicdomain/zero/1.0/) ) applies to the data made available in this article, unless otherwise stated in a credit line to the data.
spellingShingle Innovation
Dubé, Mirette
Posner, Glenn
Stone, Kimberly
White, Marjorie
Kaba, Alyshah
Bajaj, Komal
Cheng, Adam
Grant, Vincent
Huang, Simon
Reid, Jennifer
Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
title Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
title_full Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
title_fullStr Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
title_full_unstemmed Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
title_short Building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
title_sort building impactful systems-focused simulations: integrating change and project management frameworks into the pre-work phase
topic Innovation
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8082890/
https://www.ncbi.nlm.nih.gov/pubmed/33926582
http://dx.doi.org/10.1186/s41077-021-00169-x
work_keys_str_mv AT dubemirette buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT posnerglenn buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT stonekimberly buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT whitemarjorie buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT kabaalyshah buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT bajajkomal buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT chengadam buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT grantvincent buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT huangsimon buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase
AT reidjennifer buildingimpactfulsystemsfocusedsimulationsintegratingchangeandprojectmanagementframeworksintothepreworkphase