Cargando…

Cloud model-based evaluation of landslide dam development feasibility

As natural backwater structures, landslide dams both threaten downstream human settlement or infrastructure and contain abundant hydro-energy and tourism resources, so research on their development feasibility is of great significance for permanently remedying them and effectively turning disasters...

Descripción completa

Detalles Bibliográficos
Autores principales: Luo, Dengze, Li, Hongtao, Wu, Yu, Li, Dong, Yang, Xingguo, Yao, Qiang
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8115826/
https://www.ncbi.nlm.nih.gov/pubmed/33979359
http://dx.doi.org/10.1371/journal.pone.0251212
_version_ 1783691269580521472
author Luo, Dengze
Li, Hongtao
Wu, Yu
Li, Dong
Yang, Xingguo
Yao, Qiang
author_facet Luo, Dengze
Li, Hongtao
Wu, Yu
Li, Dong
Yang, Xingguo
Yao, Qiang
author_sort Luo, Dengze
collection PubMed
description As natural backwater structures, landslide dams both threaten downstream human settlement or infrastructure and contain abundant hydro-energy and tourism resources, so research on their development feasibility is of great significance for permanently remedying them and effectively turning disasters into benefits. Through an analysis of the factors influencing landslide dam development and utilization, an index system (consisting of target, rule, and index layers) for evaluating development feasibility was constructed in this paper. Considering uncertainty and randomness in development feasibility evaluation, a cloud model-improved evaluation method was proposed to determine membership and score clouds based on the uncertainty reasoning of cloud model, and a cloud model-improved analytic hierarchy process (AHP-Cloud Model) was introduced to obtain weights. Final evaluation results were obtained using a hierarchical weighted summary. The improved method was applied to evaluate the Hongshiyan and Tangjiashan landslide dams and the results were compared with the maximum membership principle results. The results showed that the cloud model depicted the fuzziness and uncertainty in the evaluation process. The improved method proposed in this paper overcame the loss of fuzziness in the maximum membership principle evaluation results, and was capable of more directly presenting evaluation results. The development feasibility of the Hongshiyan landslide dam was relatively high, while that of the Tangjiashan landslide dam was relatively low. As suggested by these results, the evaluation model proposed in this paper has great significance for preparing a long-term management scheme for landslide dams.
format Online
Article
Text
id pubmed-8115826
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Public Library of Science
record_format MEDLINE/PubMed
spelling pubmed-81158262021-05-24 Cloud model-based evaluation of landslide dam development feasibility Luo, Dengze Li, Hongtao Wu, Yu Li, Dong Yang, Xingguo Yao, Qiang PLoS One Research Article As natural backwater structures, landslide dams both threaten downstream human settlement or infrastructure and contain abundant hydro-energy and tourism resources, so research on their development feasibility is of great significance for permanently remedying them and effectively turning disasters into benefits. Through an analysis of the factors influencing landslide dam development and utilization, an index system (consisting of target, rule, and index layers) for evaluating development feasibility was constructed in this paper. Considering uncertainty and randomness in development feasibility evaluation, a cloud model-improved evaluation method was proposed to determine membership and score clouds based on the uncertainty reasoning of cloud model, and a cloud model-improved analytic hierarchy process (AHP-Cloud Model) was introduced to obtain weights. Final evaluation results were obtained using a hierarchical weighted summary. The improved method was applied to evaluate the Hongshiyan and Tangjiashan landslide dams and the results were compared with the maximum membership principle results. The results showed that the cloud model depicted the fuzziness and uncertainty in the evaluation process. The improved method proposed in this paper overcame the loss of fuzziness in the maximum membership principle evaluation results, and was capable of more directly presenting evaluation results. The development feasibility of the Hongshiyan landslide dam was relatively high, while that of the Tangjiashan landslide dam was relatively low. As suggested by these results, the evaluation model proposed in this paper has great significance for preparing a long-term management scheme for landslide dams. Public Library of Science 2021-05-12 /pmc/articles/PMC8115826/ /pubmed/33979359 http://dx.doi.org/10.1371/journal.pone.0251212 Text en © 2021 Luo et al https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/) , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
spellingShingle Research Article
Luo, Dengze
Li, Hongtao
Wu, Yu
Li, Dong
Yang, Xingguo
Yao, Qiang
Cloud model-based evaluation of landslide dam development feasibility
title Cloud model-based evaluation of landslide dam development feasibility
title_full Cloud model-based evaluation of landslide dam development feasibility
title_fullStr Cloud model-based evaluation of landslide dam development feasibility
title_full_unstemmed Cloud model-based evaluation of landslide dam development feasibility
title_short Cloud model-based evaluation of landslide dam development feasibility
title_sort cloud model-based evaluation of landslide dam development feasibility
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8115826/
https://www.ncbi.nlm.nih.gov/pubmed/33979359
http://dx.doi.org/10.1371/journal.pone.0251212
work_keys_str_mv AT luodengze cloudmodelbasedevaluationoflandslidedamdevelopmentfeasibility
AT lihongtao cloudmodelbasedevaluationoflandslidedamdevelopmentfeasibility
AT wuyu cloudmodelbasedevaluationoflandslidedamdevelopmentfeasibility
AT lidong cloudmodelbasedevaluationoflandslidedamdevelopmentfeasibility
AT yangxingguo cloudmodelbasedevaluationoflandslidedamdevelopmentfeasibility
AT yaoqiang cloudmodelbasedevaluationoflandslidedamdevelopmentfeasibility